Syntax
The date "{toDate}" specified for an activation or a charging operation is too far in the future considering
the value of the parameter PERIOD_LIMIT_ACTIVATION ("{periodLimitActivation}") and the current system date
The meaning of this error cause message depends on the software layers and internal architecture of the SAP CC systems. See the note to adapt the terminology to the concepts and data models you work with.
In the business operation requests, change the activation date or the consumption date to a date before the period limit. Verify if the value of the parameter PERIOD_LIMIT_ACTIVATION is correct depending on the business requirements.
Verify your changes.
Consider the specifications of the appropriate technical interfaces: Web Services, HTTP Communication Interface (HCI), or Message TCP.
This error code is valid from SAP CC version number 4.0 SP09 to the software version that this documentation refers to. For newer versions, consult the relevant documentation.