Syntax
The Master charge plan item "{masterChargePlanItemId}" and the Dependent charge plan item "{dependentChargePlanItemId}" must define their currency at the same level and
with the same value
because the adjustment mode of the dependent is merging or splitting.
The meaning of this error cause message depends on the software layers and internal architecture of the SAP CC systems. See the note to adapt the terminology to the concepts and data models you work with.
Define the both charges currency at the charge plan item level and with the same value.
Verify your changes.
Consider the specifications of the appropriate technical interfaces: Web Services, HTTP Communication Interface (HCI), or Message TCP.
This error code is valid from SAP CC version number 3.0 SP00 to the software version that this documentation refers to. For newer versions, consult the relevant documentation.