Log Message: com.sap.SCC.core_server.000506
Message (INFO)
Syntax
Rater instance has visited {successCount} charging contract(s), {allowanceVisited} allowance(s) is/are visited, {allowancePurged} allowance(s) is/are purged and {errorCount} charging contract visit(s) cannot be purged
Legend
- {successCount}:
- The number of charging contracts with allowances successfully purged
- {allowanceVisited}:
- The number of allowances visited
- {allowancePurged}:
- The number of allowances successfully purged
- {errorCount}:
- The number of charging contracts with allowances that could not be purged
Severity
InformationDetailed Information (Common Infrastructure Log)
This rater instance of the SAP CC Core Server system has finished the Allowances Purge mechanism.
Possible Impacts
Some charging contracts may not have been purged. The number of charging contracts that could not be purged is specified in the message.
Next Steps
This section provides you with some troubleshooting operations to identify the correction actions to be performed. In a production system landscape, contact your SAP Support Team for each fatal error message in the logs.
If some charging contract could not be purged, it is mandatory to check that the previous error messages to determine the cause.
SAP User Experience
Enrich your SAP user experience and join our community:
Recommendation
SAP provides you with the SAP Community Network (SCN) platform. You can benefit from a wide range of technical and business guidance from a community of experts and share knowledge and your best practices.
Share your symptoms or step-by-step resolutions to a wide range of problems that may occur in your work with SAP Convergent Charging.

