Error Code: OPERATIONALSTATUS-4

Message

Syntax

The operational status of the contract cannot be modified because the contract is a linked charging contract.

Next Actions and Steps

Modify the operational status of the root charging contract corresponding to this linked charging contract.

Check your corrections.

Additional Information

Consider the specifications of the appropriate technical interfaces: Web Services, HTTP Communication Interface (HCI), or Message TCP.

Validity

This error code is valid from SAP CC technical version 4.5.8.0

Note

The technical version 4.5.n.n relates to the commercial release 4.0 of SAP Convergent Charging. The third digit relates to the maintenance support package (SP), and the last technical digit relates to the patch level available within this SP.

The technical version 4.4.n.n relates to the commercial release 3.0 of SAP Convergent Charging. The third digit relates to the maintenance support package (SP), and the last technical digit relates to the patch level available within this SP.