Error Code: CONTRACTSTATE-14
Message
Syntax
The specified LastActivationDate "{lastActivationDate}" in the charge activation "{chargeActivationId}" of the contract item "{chargingContractItemId}" is anterior to the validity start date of the contract item "{chargingContractItemValidityStartDate}".
Legend
- {lastActivationDate}:
- The LastActivationDate of the charge activation (or refill activation)
- {chargeActivationId}:
- The ID of the charge activation (or refill activation)
- {chargingContractItemId}:
- The ID of the contract item
- {chargingContractItemValidityStartDate}:
- The validity start date of the contract item
Next Actions and Steps
Specify a LastActivationDate posterior to the validity start date of the contract item.
Check your corrections.
Additional Information
Consider the specifications of the appropriate technical interfaces: Web Services, HTTP Communication Interface (HCI), or Message TCP.
Validity
This error code is valid from SAP CC technical version 4.4.10.0
Note
The technical version 4.5.n.n relates to the commercial release 4.0 of SAP Convergent Charging. The third digit relates to the maintenance support package (SP), and the last technical digit relates to the patch level available within this SP.
The technical version 4.4.n.n relates to the commercial release 3.0 of SAP Convergent Charging. The third digit relates to the maintenance support package (SP), and the last technical digit relates to the patch level available within this SP.
