Error Code: CONTRACT-28

Message

Syntax

Impossible to modify the linked contract because the parent contract ID {specifiedchargingContractId} specified in the operation request does not correspond to the parent contract ID {realchargingContractId} which already exists in the linked contract.

Legend
{specifiedchargingContractId}:
The provider contract ID specified in the operation
{realchargingContractId}:
The provider contract ID which already exists in the linked provider contract

Next Actions and Steps

Change the provider contract ID to the existing one {1}.

Check your corrections.

Additional Information

Consider the specifications of the appropriate technical interfaces: Web Services, HTTP Communication Interface (HCI), or Message TCP.

Validity

This error code is valid from SAP CC technical version 4.5.0.0

Note

The technical version 4.5.n.n relates to the commercial release 4.0 of SAP Convergent Charging. The third digit relates to the maintenance support package (SP), and the last technical digit relates to the patch level available within this SP.

The technical version 4.4.n.n relates to the commercial release 3.0 of SAP Convergent Charging. The third digit relates to the maintenance support package (SP), and the last technical digit relates to the patch level available within this SP.