Error Code: CHARGINGPLAN-34

Message

Syntax

The date "{toDate}" specified for an activation or a charging operation is too far in the future considering the value of the parameter PERIOD_LIMIT_ACTIVATION ("{periodLimitActivation}") and the current system date

Legend
{toDate}:
The consumption date or the date at which the activation process is run
{periodLimitActivation}:
The runtime value of the parameter PERIOD_LIMIT_ACTIVATION

Next Actions and Steps

In the business operation requests, change the activation date or the consumption date to a date before the period limit. Verify if the value of the parameter PERIOD_LIMIT_ACTIVATION is correct depending on the business requirements.

Check your corrections.

Additional Information

Consider the specifications of the appropriate technical interfaces: Web Services, HTTP Communication Interface (HCI), or Message TCP.

Validity

This error code is valid from SAP CC technical version 4.5.9.0

Note

The technical version 4.5.n.n relates to the commercial release 4.0 of SAP Convergent Charging. The third digit relates to the maintenance support package (SP), and the last technical digit relates to the patch level available within this SP.

The technical version 4.4.n.n relates to the commercial release 3.0 of SAP Convergent Charging. The third digit relates to the maintenance support package (SP), and the last technical digit relates to the patch level available within this SP.