Error Code: CHARGEPLAN-101

Message

Syntax

The Charge Dependency at index {firstIndex} having the masterCode "{masterCode}" and the dependentCode "{dependentCode}" is already used at index {secondIndex}.

Legend
{masterCode}:
The masterCode that appears in the two Charge Dependency
{dependentCode}:
The dependentCode that appears in the two Charge Dependency
{firstIndex}:
The index of the first occurrence of the Charge Dependency
{secondIndex}:
The index of the second occurrence of the Charge Dependency

Next Actions and Steps

Remove one of the dependencies.

Check your corrections.

Additional Information

Consider the specifications of the appropriate technical interfaces: Web Services, HTTP Communication Interface (HCI), or Message TCP.

Validity

This error code is valid from SAP CC technical version 4.4.0.0

Note

The technical version 4.5.n.n relates to the commercial release 4.0 of SAP Convergent Charging. The third digit relates to the maintenance support package (SP), and the last technical digit relates to the patch level available within this SP.

The technical version 4.4.n.n relates to the commercial release 3.0 of SAP Convergent Charging. The third digit relates to the maintenance support package (SP), and the last technical digit relates to the patch level available within this SP.