Mass Replacement of Controls

Use

Workflow ID: WS00600072

You can replace more than one instance of a control at a time with a new control or a new linked object.

Process



Mass Replacement of Controls Workflow
  1. In the guided activity Mass Replace Controls, the user specifies the controls to be replaced.

  2. For each risk assessment that involves a control that is to be replaced, the risk assessment lead receives a work item with the request to accept or reject the replacement.

  3. Based on the decision of the risk assessment lead, the control is updated in either the current risk assessment or a follow-up risk assessment.

    • For risk assessments with the status In Process, the control is replaced directly in the risk assessment

    • For risk assessments with the status Closed, the risk assessment lead has to assign the affected risks to risk assessments and start the risk follow-up process. The system then creates follow-up revisions of the risks and replaces the control in the new risk revision.

    If, however, the replacement is rejected, no update is made and the user who wanted to replace the control is notified.

More Information

For more information about how to replace controls, see Replacing Controls