Replacing Controls
Use
When regulations or internal policy for protecting workers’ health and safety change, or when a type of control is ineffective or outdated, you need to adapt the controls currently in place for treating risk.
In the application, you can replace a control globally at all locations or replace it only in specific instances. When you replace a control, the system automatically informs all the assessment leads affected by the replacement. After the assessment leads approve the replacement, the system replaces the controls in the risk assessment. This process reduces administrative effort and ensures a consistent approach to treating risk.
Prerequisites
-
You have created any required controls. You can create controls using the Edit Control Master Data service.
-
If you want to replace links from controls to other objects, such as material from Materials Management (MM) or equipment from Plant Maintenance (PM), you have configured your system to integrate to these systems.
Procedure
To select and submit a control for replacement:
-
Under , choose Mass Replace Controls and enter the control to replace. From the control master data, you can also choose to mass replace a selected control.
-
Select the locations where you want to replace the control and select the relevant instances of the control that you want to replace.
-
Choose how to replace the control, for example, the control and its linked object or only the linked object, and enter the new control or new linked object.
-
Enter a replacement due date and any relevant information about the replacement for the processor of the replacement. The processor of the replacement task is the assessment lead or the creator of the risk assessment.
-
Review the information you entered and then choose Submit.
Result
After you submit the replacement, for each relevant risk assessment, the assessment lead receives a task to either accept or reject the control replacement.
If the assessment lead accepts the control replacement, the following occurs:
-
The system does not replace the controls automatically for risks with the status Released. You have to select the risk assessment for which you want to follow up on the risks and start a risk follow-up process. The system then creates follow-up revisions of the risks and replaces the controls.
-
For risk assessments with the status In Process, the old control is replaced with the new control.
The assessment lead must cancel any open tasks in the old control. The assessment lead can then create new tasks, such as a request for a training course on proper use of the new control.
-
If the control to be replaced is assigned to a scheduled recurring inspection series, the control will be deleted from that series, starting from the next scheduled inspection in the series.
If the risk assessment lead rejects the proposed replacement, the system sends you notification.
More Information
For more information about creating controls, see Hazard and Control Register.
For more information about integration with Materials Management or Plant Maintenance, see Integration with Other Components.