Determination of Material BOM for Synchronization
In the General Data
under Assignments Routing to Material BOM
, you specify a manufacturing BOM header for every routing, with Material, Plant, Alternative, Use, Change Number
. In addition, you must specify the change number that is to be created or changed with the BOM. By default, the header quantity is 1 and is copied from the BOM material. The system creates the manufacturing BOM below this BOM header during synchronization and adds its elements to the routing operations.
(see Effectivity in Routing Component Assignment).

Assignment Between Product Structure Elements, Routing Operations, and a Manufacturing BOM
In Assignments Routing to Material BOM
, under Open Details
, you can decide whether you also want to synchronize object dependencies and document links (see Synchronization of Linked Objects).
Choose Previous Object
and Next Object
to navigate between the different Assignments Routing to Material BOM
.
If you select the Display All Items Under BOM Header
checkbox, the system displays the BOM items for the manufacturing BOM under the BOM header in the Routing Structure
area.