Effectivity in Routing Component Assignment
You can determine different effectivities for objects in the routing component assignment.
For the product structure
You define the product structure effectivity, which determines the planning scope, in the simulation
. You have the following options:
Date validity
You can define a validity period for the planning scope under Data
. The system copies the current date as the valid-from date.
Parameter effectivity
Under Effectivity Values
, you enter values for all the parameters that you use in your product structure.
For the routing
You define the key date for the routing effectivity under General Data
, or you defeiine a validity period via the change number used.
Note
The system always handles the change numbers by priority: The system ignores the key date if it is not within the validity period of the change number used, and in this case issues an error message.
For the manufacturing BOM
You determine the validity period of the manufacturing BOM under Assignment Routing to Material BOM
via the change number used.
Note
In the routing component assignment, you can only use change numbers that you have defined with date effectivity for the routing and BOM. The system issues a corresponding message in the following situations:
When you specify a change number with parameter effectivity for the routing
When you specify a change number with parameter effectivity for the manufacturing BOM
During assignment of a product structure element to an operation, if you have created the associated routing with parameter effectivity
With respect to the change number used for routings and BOMs, you can change these outside of the routing component assignment as well, such as in the Enginerering Workbench. The system conducts a consistency check along with the synchronization and determines whether you are using change numbers with parameter effectivity for the BOMs and for the routing, and if this is the case, it issues a corresponding message.