Creating Planning Views

You can create planning views to view, edit, and share information that you work with as a planner or other user of SAP Integrated Business Planning.

You can create planning views in SAP Integrated Business Planning, add-in for Microsoft Excel (Excel add-in) in the following ways:

Option

What does it do?

Who is it meant to be used by?

From Template...

Creates a planning view based on a template created by an administrator.

Business users.

Without Template On Current Sheet...

Creates a planning view without a template.

Business users.

Change History View On Current Sheet...

Creates a change history view.

Business users.

Copy Current Sheet

Copies the current planning view worksheet including all content, sheet-specific code, and SAP IBP definitions.

Business users.

Copy Current Workbook w/o Formatting

Copies the current planning view without conditional formatting, local members, or sheet options. This option is meant to be used for support purposes only.

Template administrators.

Only available with the permission for planning view templates

PV_TMPLT (Planning View Template)

.

You can have multiple planning views in one workbook, with a maximum of one planning view per worksheet.

When you've created a planning view, depending on your authorizations, you can do the following with it:

  • As a business user, you can save the planning view as a favorite.

    Favorites are available only to you, but you can also choose to share them (see Creating Planning View Favorites).

  • As an administrator, you can also save the planning view as a template.

    Templates are available to all users and business roles who create planning views (see Planning View Templates).

Steps

  1. Log on to your SAP IBP system, and open a workbook in Microsoft Excel.

  2. In the Planning Views group, click the arrow next to New View and select one of the available options.

    If you do not use a template and you click a particular cell in Microsoft Excel before you choose New View, the first value in the view will be inserted at that location, provided there is space for the axes above and to the left. Leave some room for more columns and some empty rows for header information, and click to put the focus on the cell where you want the data grid to start.

  3. Select the version (the base version is used by default), and if you selected From Template, select the required template.

    For more information on versions, see Version Planning.

    You can also specify a scenario (see Creating Scenarios).

    If a planning operator is assigned to the planning area for which you are creating the planning view, you can also specify the planning scope (see Creating a Supply Plan in the SAP IBP, Add-In for Microsoft Excel (Planner)).

  4. Check the settings (such as, key figures, planning level, and so on) derived from the selected template, or if you are not using a template, make the required settings.

    If you have selected a template with multiple views, you must check the settings for each view. If required, you can define different settings per view, for example, different planning levels or key figures. If you change time and key figures in a template, note that any chart or key figure formatting in the template may be affected. You can make the settings shown in the following table:

    Setting

    Description

    Time horizon

    Define the time periods, the period level (such as month or quarter) and if you want to display this data in periods, or automatically aggregate it in totals.

    You can also set the time horizon to be Rolling, From Rolling, To Rolling, or Fixed. If you want the horizon to adjust to the current date automatically, select Rolling. The application then updates the from and to values for each period.

    Attributes

    Select the attributes that you want to see on your planning view and use as your planning level.

    Key figures

    As well as selecting the required key figures, you can specify a conversion value (for example, currency or unit of measure). The system administrator must configure the field name and the conversion in the model configuration.

    Layout

    If you have the required authorization, you can change the axes (row or column) of key figures, attributes of planning levels, time periods, and versions.

    Filter

    If you create a planning view using a template, the template may have predefined filter criteria that are transferred to the planning view you create.

    You can also create your own filters and then save them. You can access them in the Planning Filters app as well. This enables you to reuse the same filter across all your views and quickly switch between several predefined filters when working within one view. You can also reuse filters in other contexts, for example, for copying versions, or for selected jobs that you trigger from the Advanced group (the availability of the filter depends on the algorithm used for the job).

    Alerts

    To have the system format the cells associated with an alert, choose the alert calculation, key figure to highlight, color for highlighting, and, if applicable, version and scenario. The system only offers alerts applicable to the key figures in your planning view. Check the alert overview on the Alerts tab to find out which key figures are referenced by the alert that you want to use.

    To show the alert on the alerts dashboard, the planning view must be a favorite. Enter a unique name for the alert, then update or add your favorite.

    The number of exceptions shown in the Alert Dashboard for one alert key figure and one favorite are determined by the base planning level of the alert key figure. In the planning view, the aggregation mode (for example, SUM and MAX) is used to determine the aggregated number of alerts for the planning view levels (for example, when the aggregation is done for the selected attributes and time period level).

    In the case of the Alert Dashboard, the aggregation is done in the same way as for the given favorite (for example, the aggregation is done over all attributes and all periods).

  5. Choose OK.

Result

The system displays the latest data based on the template you selected or on the settings you made. If you didn't use a template, you can adjust the position of the planning view by adding or deleting rows or columns above or to the left of the planning view.