Version Planning

A version is a separate set of data, which is used to manage an alternate plan.

Context

It consists of a set of key figures. The base version is provided in the standard system. Model administrators can define additional versions (for example, upside and downside) by copying the base version, and if required, they can create version-specific master data.

When you create or edit a planning view, you specify which version the planning view includes. If you include the base version in the planning view, you can add any of the key figures to the planning view. If you include a version other than the base version only, you can add only those key figures that are marked as version-specific key figures in the configuration of the given version.

When you edit the key figure data in a planning view, you can work on one version, or you can work on multiple versions simultaneously, which allows you to compare and adjust key figure data. To have different key figure values in different versions, the key figure must be marked version-specific in the configuration of the given versions.

In the Excel add-in, the functions in the Versions group enable you to carry out various tasks, as shown in the following table:

Function

Description

Manage

Copies key figures from one version to another. If version-specific master data has been configured, you can also copy master data from one version to another.

The following copy functions are available:

  • Copy: updates existing data and insert new data.

  • Delete: removes all selected data including the corresponding planning notes from the source version (no target version required).

Status

Checks the status of the background job created when you copy master data and key figures between versions.

Schedule

Plans recurring jobs for version management.

Procedure

  1. In the Versions group under Manage, use the Copy function to initialize your own version by copying data from the base version to your version.

    With that, you'll start with an identical set of data in your own version as in the base version.

  2. In the planning view settings, specify the versions that you want to work on.

    When you open the planning view, the version names are displayed in the planning view as follows:

    • Single version

      In the case of the base version, the version name is not displayed. For any other version, the name is displayed to differentiate it from the base version.

    • Multiple versions (for example, base, downside, and upside)

      Depending on the design of the planning view, the version names are either displayed in the Version column or they are displayed as column headers.

  3. Edit your version data and simulate and save as usual (see Simulation of the Effect of Data Changes).
  4. Use the version management functions in the Version group under Manage to copy data from one version to another or delete data in a version.