Process Flow: Hand Over Engineering Bills of Material (EBOM)

The following diagram shows the required process steps and who does the steps:

Processing EBOMs from External Data System (SAP S/4HANA BOMs)

Create Engineering Designs and Engineering BOMsLaunch appSearch EBOMsInitiate HandoverPlan MBOMPublish MBOMIncorporate Changes and Change ReconciliationExternal Data

Hover over the elements for description or click the elements for more information.

Create Engineering Designs and Engineering BOMs

The design engineer using the SAP ECTR or CAD tools creates the design structure and also creates the engineering BOMs in the external data.

Launch app

The production engineer launches the Hand Over Bills of Material (EBOM) app.

Search EBOMs

To begin with, the production engineer searches for the products or the engineering BOMs created in the external data. The EBOMs act as the source for creating or maintaining the MBOMs.

For more information, see Searching and Filtering.

Initiate Handover

With the EBOMs in the worklist, the production engineer proceeds to create a handover for the desired EBOM.

For details, see Creating a Handover.

Plan MBOM

The creation of handover initiates the system to load the EBOM as source BOM for creating an MBOM. The production engineer can explode the BOM in a multilevel hierarchy.

For details, see Planning and Publishing a Manufacturing Bill of Material (MBOM).

Publish MBOM

Once the MBOM is ready, the production engineering saves the data to the external data system by publishing the MBOM. The status of the handover changes to Published.

Incorporate Changes and Change Reconciliation

The production engineer does the following:
  • Loads the latest changes initiated in the source EBOM according to the validity dates.

  • Incorporates the changes to the target MBOM using the Change Reconciliation workbench.

For more information, see Incorporating Changes.

External Data

The app integrates with the external data to retrieve the source EBOM and to publish the target MBOM.

Processing Product Structures Using Product Data Integration

The following graphic shows the process for deriving product structures from non-SAP authoring system data via Product Data Integration:

Processing of product data in SAP PLM

For more information on PDI, see User Guide for Product Data Integration.

The following diagram shows the required process steps in the Hand Over Engineering Bills of Material (EBOMs) app and who does the steps:

Launch AppSearch SAP PLM BOMsInitiate HandoverPlan MBOMsPublish MBOMsIncorporate Changes to MBOM

Hover over the elements for description or click the elements for more information.

Launch app

The production engineer launches the Hand Over Bills of Material (EBOM) app.

Search PLM BOMs

To begin with, the production engineer searches for the products structures in the SAP IPD system. The product structures act as the source for creating or maintaining the MBOMs.

For more information, see Searching and Filtering.

Initiate Handover

With the EBOMs in the worklist, the production engineer proceeds to create a handover for the desired EBOM.

For details, see Creating a Handover.

Plan MBOM

The creation of handover initiates the system to load the EBOM as source BOM for creating an MBOM. The production engineer can explode the BOM in a multilevel hierarchy.

For details, see Planning and Publishing a Manufacturing Bill of Material (MBOM).

Publish MBOM

Once the MBOM is ready, the production engineering saves the data to the external system system by publishing the MBOM. The status of the handover changes to Published.

Incorporate Changes and Change Reconciliation

The production engineer does the following:
  • Loads the latest changes initiated in the source EBOM according to the validity dates.

  • Incorporates the changes to the target MBOM using the Change Reconciliation workbench.

For more information, see Incorporating Changes.