Filler Calendar for PBE The PBE filler calendar generates missing PBE documents or completes existing PBE documents that are incomplete. In praxis it is used as a type of controlling mechanism or “educational measure”.
Example
The construction workers/the construction site manager has forgotten to enter PBE documents for excavator A on 04.04. The excavator was being repaired on this date, however the missing 8 hours for the 04.04. are nevertheless still filled and settled with activity and settlement type “in operation” as defined in the filler calendar for PBE.
PBE documents that are then taken into account in the Generation of SD Orders are generated by the following function:
At least one unit of activity must have been entered manually for the equipment in the commissioning period.
If you want to be able to complete/fill PBE documents, you must have defined a
separate
document type for which the
Generate hours
indicator has been set. (Customizing for
Equipment and Tools Management (ETM)
under
and
Assign Activity Types per Document Type
).
You must have defined for which activity type you want missing daily documents to be created or existing documents to be completed. You can do this in Customizing for .
You can define, on different levels and for each activity type, the maximum number of hours that the system creates or fills with which activity type if there are gaps in the documents.
The PBE filler calendar is only relevant to performance-based equipment.
You can find further information under Creating a Filler Calendar for Performance-Based Equipment .