ETM Planning

Purpose

You can use ETM planning to help you enter requirements (for example, equipment needed by a usage site) that will then be processed by a stock and requirements planning controller. The controller uses the characteristics ( classes ) of the equipment that is needed to process the requirements and find the equipment that most exactly fulfils the requirements and is available for use at the required time .

Process Flow

  • Requesting party (for example, construction site supervisor) reports a requirement

  • This requirement is entered in the system in the form of a requisition note with the a ppropriate characteristics

  • The stock and requirements planning controller uses the requirements overview to process the requirements for the recipients that have been assigned to him (for his planning area).

  • A shipping document is used to send the required and confirmed equipment to the appropriate usage site.