public static final class SchAgrmtItem.SchAgrmtItemBuilder extends Object
Modifier and Type | Method and Description |
---|---|
SchAgrmtItem.SchAgrmtItemBuilder |
accountAssignmentCategory(String accountAssignmentCategory)
Constraints: Not nullable, Maximum length: 1
|
SchAgrmtItem |
build() |
SchAgrmtItem.SchAgrmtItemBuilder |
companyCode(String companyCode)
Constraints: Not nullable, Maximum length: 4
|
SchAgrmtItem.SchAgrmtItemBuilder |
cumulativeQuantityIsNotSent(Boolean cumulativeQuantityIsNotSent)
Constraints: none
|
SchAgrmtItem.SchAgrmtItemBuilder |
documentCurrency(String documentCurrency)
Constraints: Not nullable, Maximum length: 5
|
SchAgrmtItem.SchAgrmtItemBuilder |
evaldRcptSettlmtIsAllowed(Boolean evaldRcptSettlmtIsAllowed)
Constraints: none
|
SchAgrmtItem.SchAgrmtItemBuilder |
firmTradeOffZoneBindMRP(String firmTradeOffZoneBindMRP)
Constraints: Not nullable, Maximum length: 1
|
SchAgrmtItem.SchAgrmtItemBuilder |
goodsReceiptIsExpected(Boolean goodsReceiptIsExpected)
Constraints: none
|
SchAgrmtItem.SchAgrmtItemBuilder |
goodsReceiptIsNonValuated(Boolean goodsReceiptIsNonValuated)
Constraints: none
|
SchAgrmtItem.SchAgrmtItemBuilder |
incotermsClassification(String incotermsClassification)
Constraints: Not nullable, Maximum length: 3
|
SchAgrmtItem.SchAgrmtItemBuilder |
incotermsTransferLocation(String incotermsTransferLocation)
Constraints: Not nullable, Maximum length: 28
|
SchAgrmtItem.SchAgrmtItemBuilder |
invoiceIsExpected(Boolean invoiceIsExpected)
Constraints: none
|
SchAgrmtItem.SchAgrmtItemBuilder |
invoiceIsGoodsReceiptBased(Boolean invoiceIsGoodsReceiptBased)
Constraints: none
|
SchAgrmtItem.SchAgrmtItemBuilder |
isInfoAtRegistration(String isInfoAtRegistration)
Constraints: Not nullable, Maximum length: 1
|
SchAgrmtItem.SchAgrmtItemBuilder |
isInfoRecordUpdated(String isInfoRecordUpdated)
Constraints: Not nullable, Maximum length: 1
|
SchAgrmtItem.SchAgrmtItemBuilder |
isOrderAcknRqd(Boolean isOrderAcknRqd)
Constraints: none
|
SchAgrmtItem.SchAgrmtItemBuilder |
isRelevantForJITDelivSchedule(String isRelevantForJITDelivSchedule)
Constraints: Not nullable, Maximum length: 1
|
SchAgrmtItem.SchAgrmtItemBuilder |
itemLastTransmissionDate(LocalDateTime itemLastTransmissionDate)
Constraints: Not nullable, Precision: 0
|
SchAgrmtItem.SchAgrmtItemBuilder |
manufacturerMaterial(String manufacturerMaterial)
Constraints: Not nullable, Maximum length: 40
|
SchAgrmtItem.SchAgrmtItemBuilder |
material(String material)
Constraints: Not nullable, Maximum length: 40
|
SchAgrmtItem.SchAgrmtItemBuilder |
materialGroup(String materialGroup)
Constraints: Not nullable, Maximum length: 9
|
SchAgrmtItem.SchAgrmtItemBuilder |
materialType(String materialType)
Constraints: Not nullable, Maximum length: 4
|
SchAgrmtItem.SchAgrmtItemBuilder |
minRemainingShelfLife(BigDecimal minRemainingShelfLife)
Constraints: Not nullable, Precision: 4, Scale: 0
|
SchAgrmtItem.SchAgrmtItemBuilder |
multipleAcctAssgmtDistribution(String multipleAcctAssgmtDistribution)
Constraints: Not nullable, Maximum length: 1
|
SchAgrmtItem.SchAgrmtItemBuilder |
netPriceAmount(BigDecimal netPriceAmount)
Constraints: Not nullable, Precision: 12, Scale: 3
|
SchAgrmtItem.SchAgrmtItemBuilder |
netPriceQuantity(BigDecimal netPriceQuantity)
Constraints: Not nullable, Precision: 5, Scale: 0
|
SchAgrmtItem.SchAgrmtItemBuilder |
nextFcstDelivSchedSendingDate(LocalDateTime nextFcstDelivSchedSendingDate)
Constraints: Not nullable, Precision: 0
|
SchAgrmtItem.SchAgrmtItemBuilder |
nextJITDelivSchedSendingDate(LocalDateTime nextJITDelivSchedSendingDate)
Constraints: Not nullable, Precision: 0
|
SchAgrmtItem.SchAgrmtItemBuilder |
noDaysReminder1(BigDecimal noDaysReminder1)
Constraints: Not nullable, Precision: 3, Scale: 0
|
SchAgrmtItem.SchAgrmtItemBuilder |
noDaysReminder2(BigDecimal noDaysReminder2)
Constraints: Not nullable, Precision: 3, Scale: 0
|
SchAgrmtItem.SchAgrmtItemBuilder |
noDaysReminder3(BigDecimal noDaysReminder3)
Constraints: Not nullable, Precision: 3, Scale: 0
|
SchAgrmtItem.SchAgrmtItemBuilder |
orderPriceUnit(String orderPriceUnit)
Constraints: Not nullable, Maximum length: 3
|
SchAgrmtItem.SchAgrmtItemBuilder |
orderPriceUnitToOrderUnitNmrtr(BigDecimal orderPriceUnitToOrderUnitNmrtr)
Constraints: Not nullable, Precision: 5, Scale: 0
|
SchAgrmtItem.SchAgrmtItemBuilder |
orderQuantityUnit(String orderQuantityUnit)
Constraints: Not nullable, Maximum length: 3
|
SchAgrmtItem.SchAgrmtItemBuilder |
ordPriceUnitToOrderUnitDnmntr(BigDecimal ordPriceUnitToOrderUnitDnmntr)
Constraints: Not nullable, Precision: 5, Scale: 0
|
SchAgrmtItem.SchAgrmtItemBuilder |
overdelivTolrtdLmtRatioInPct(BigDecimal overdelivTolrtdLmtRatioInPct)
Constraints: Not nullable, Precision: 3, Scale: 1
|
SchAgrmtItem.SchAgrmtItemBuilder |
partialInvoiceDistribution(String partialInvoiceDistribution)
Constraints: Not nullable, Maximum length: 1
|
SchAgrmtItem.SchAgrmtItemBuilder |
plant(String plant)
Constraints: Not nullable, Maximum length: 4
|
SchAgrmtItem.SchAgrmtItemBuilder |
priceIsToBePrinted(Boolean priceIsToBePrinted)
Constraints: none
|
SchAgrmtItem.SchAgrmtItemBuilder |
productType(String productType)
Constraints: Not nullable, Maximum length: 2
|
SchAgrmtItem.SchAgrmtItemBuilder |
purchaseRequisition(String purchaseRequisition)
Constraints: Not nullable, Maximum length: 10
|
SchAgrmtItem.SchAgrmtItemBuilder |
purchaseRequisitionItem(String purchaseRequisitionItem)
Constraints: Not nullable, Maximum length: 5
|
SchAgrmtItem.SchAgrmtItemBuilder |
purchasingDocumentCategory(String purchasingDocumentCategory)
Constraints: Not nullable, Maximum length: 1
|
SchAgrmtItem.SchAgrmtItemBuilder |
purchasingDocumentDeletionCode(String purchasingDocumentDeletionCode)
Constraints: Not nullable, Maximum length: 1
|
SchAgrmtItem.SchAgrmtItemBuilder |
purchasingDocumentItemCategory(String purchasingDocumentItemCategory)
Constraints: Not nullable, Maximum length: 1
|
SchAgrmtItem.SchAgrmtItemBuilder |
purchasingDocumentItemText(String purchasingDocumentItemText)
Constraints: Not nullable, Maximum length: 40
|
SchAgrmtItem.SchAgrmtItemBuilder |
purchasingInfoRecord(String purchasingInfoRecord)
Constraints: Not nullable, Maximum length: 10
|
SchAgrmtItem.SchAgrmtItemBuilder |
purgDocEstimatedPrice(Boolean purgDocEstimatedPrice)
Constraints: none
|
SchAgrmtItem.SchAgrmtItemBuilder |
purgDocOrderAcknNumber(String purgDocOrderAcknNumber)
Constraints: Not nullable, Maximum length: 20
|
SchAgrmtItem.SchAgrmtItemBuilder |
qualityCertificateType(String qualityCertificateType)
Constraints: Not nullable, Maximum length: 4
|
SchAgrmtItem.SchAgrmtItemBuilder |
qualityMgmtCtrlKey(String qualityMgmtCtrlKey)
Constraints: Not nullable, Maximum length: 8
|
SchAgrmtItem.SchAgrmtItemBuilder |
referenceDeliveryAddressID(String referenceDeliveryAddressID)
Constraints: Not nullable, Maximum length: 10
|
SchAgrmtItem.SchAgrmtItemBuilder |
requirementTracking(String requirementTracking)
Constraints: Not nullable, Maximum length: 10
|
SchAgrmtItem.SchAgrmtItemBuilder |
schAgrmtAcCnt(SchAgrmtAcCnt... value)
Navigation property to_SchAgrmtAcCnt for SchAgrmtItem to multiple SchAgrmtAcCnt.
|
SchAgrmtItem.SchAgrmtItemBuilder |
schAgrmtSchLine(SchAgrmtSchLine... value)
Navigation property to_SchAgrmtSchLine for SchAgrmtItem to multiple SchAgrmtSchLine.
|
SchAgrmtItem.SchAgrmtItemBuilder |
schedAgrmtAgreedCumQty(BigDecimal schedAgrmtAgreedCumQty)
Constraints: Not nullable, Precision: 13, Scale: 3
|
SchAgrmtItem.SchAgrmtItemBuilder |
schedAgrmtCumQtyReconcileDate(LocalDateTime schedAgrmtCumQtyReconcileDate)
Constraints: Not nullable, Precision: 0
|
SchAgrmtItem.SchAgrmtItemBuilder |
schedAgrmtCumulativeQtyControl(String schedAgrmtCumulativeQtyControl)
Constraints: Not nullable, Maximum length: 1
|
SchAgrmtItem.SchAgrmtItemBuilder |
schedgAgrmtDeliveryAddress(SchedgAgrmtDeliveryAddress value)
Navigation property to_SchedgAgrmtDeliveryAddress for SchAgrmtItem to single
SchedgAgrmtDeliveryAddress.
|
SchAgrmtItem.SchAgrmtItemBuilder |
schedgAgrmtItmNotes(SchedgAgrmtItmNotes... value)
Navigation property to_SchedgAgrmtItmNotes for SchAgrmtItem to multiple
SchedgAgrmtItmNotes.
|
SchAgrmtItem.SchAgrmtItemBuilder |
schedgAgrmtRelCreationProfile(String schedgAgrmtRelCreationProfile)
Constraints: Not nullable, Maximum length: 4
|
SchAgrmtItem.SchAgrmtItemBuilder |
schedLineSemiFirmOrderInDays(BigDecimal schedLineSemiFirmOrderInDays)
Constraints: Not nullable, Precision: 3, Scale: 0
|
SchAgrmtItem.SchAgrmtItemBuilder |
scheduleLineFirmOrderInDays(BigDecimal scheduleLineFirmOrderInDays)
Constraints: Not nullable, Precision: 3, Scale: 0
|
SchAgrmtItem.SchAgrmtItemBuilder |
schedulingAgreement(String schedulingAgreement)
(Key Field) Constraints: Not nullable, Maximum length: 10
|
SchAgrmtItem.SchAgrmtItemBuilder |
schedulingAgreementItem(String schedulingAgreementItem)
(Key Field) Constraints: Not nullable, Maximum length: 5
|
SchAgrmtItem.SchAgrmtItemBuilder |
shippingInstruction(String shippingInstruction)
Constraints: Not nullable, Maximum length: 2
|
SchAgrmtItem.SchAgrmtItemBuilder |
stockType(String stockType)
Constraints: Not nullable, Maximum length: 1
|
SchAgrmtItem.SchAgrmtItemBuilder |
storageLocation(String storageLocation)
Constraints: Not nullable, Maximum length: 4
|
SchAgrmtItem.SchAgrmtItemBuilder |
supplierMaterialNumber(String supplierMaterialNumber)
Constraints: Not nullable, Maximum length: 35
|
SchAgrmtItem.SchAgrmtItemBuilder |
targetQuantity(BigDecimal targetQuantity)
Constraints: Not nullable, Precision: 13, Scale: 3
|
SchAgrmtItem.SchAgrmtItemBuilder |
taxCode(String taxCode)
Constraints: Not nullable, Maximum length: 2
|
SchAgrmtItem.SchAgrmtItemBuilder |
taxCountry(String taxCountry)
Constraints: Not nullable, Maximum length: 3
|
SchAgrmtItem.SchAgrmtItemBuilder |
taxDeterminationDate(LocalDateTime taxDeterminationDate)
Constraints: Not nullable, Precision: 0
|
String |
toString() |
SchAgrmtItem.SchAgrmtItemBuilder |
underdelivTolrtdLmtRatioInPct(BigDecimal underdelivTolrtdLmtRatioInPct)
Constraints: Not nullable, Precision: 3, Scale: 1
|
SchAgrmtItem.SchAgrmtItemBuilder |
unlimitedOverdeliveryIsAllowed(Boolean unlimitedOverdeliveryIsAllowed)
Constraints: none
|
@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder schAgrmtAcCnt(SchAgrmtAcCnt... value)
value
- The SchAgrmtAcCnts to build this SchAgrmtItem with.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder schAgrmtSchLine(SchAgrmtSchLine... value)
value
- The SchAgrmtSchLines to build this SchAgrmtItem with.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder schedgAgrmtDeliveryAddress(SchedgAgrmtDeliveryAddress value)
value
- The SchedgAgrmtDeliveryAddress to build this SchAgrmtItem with.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder schedgAgrmtItmNotes(SchedgAgrmtItmNotes... value)
value
- The SchedgAgrmtItmNotess to build this SchAgrmtItem with.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder schedulingAgreement(@Nullable String schedulingAgreement)
Original property name from the Odata EDM: SchedulingAgreement
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder schedulingAgreementItem(@Nullable String schedulingAgreementItem)
Original property name from the Odata EDM: SchedulingAgreementItem
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder companyCode(@Nullable String companyCode)
Original property name from the Odata EDM: CompanyCode
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder purchasingDocumentCategory(@Nullable String purchasingDocumentCategory)
Original property name from the Odata EDM: PurchasingDocumentCategory
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder purchasingDocumentItemCategory(@Nullable String purchasingDocumentItemCategory)
Original property name from the Odata EDM: PurchasingDocumentItemCategory
The item category controls whether the following entries and procedures are necessary or permitted for the item:material numberadditional account assignmentinventory management in the SAP Systemgoods receiptinvoice receiptIn the standard system an item in the "normal" category requires goods and invoice receipts. On the other hand for items in the "consignment" category, (that is order item for consignment material) invoice receipts are not allowed.
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder purchasingDocumentItemText(@Nullable String purchasingDocumentItemText)
Original property name from the Odata EDM: PurchasingDocumentItemText
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder material(@Nullable String material)
Original property name from the Odata EDM: Material
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder manufacturerMaterial(@Nullable String manufacturerMaterial)
Original property name from the Odata EDM: ManufacturerMaterial
This field is also used for MPN materials.
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder supplierMaterialNumber(@Nullable String supplierMaterialNumber)
Original property name from the Odata EDM: SupplierMaterialNumber
In most cases, the supplier uses a different number for the material than the one used in this system. The supplier's material number can therefore also be quoted in a purchase order for identification purposes.
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder materialGroup(@Nullable String materialGroup)
Original property name from the Odata EDM: MaterialGroup
You can use material groups to:Restrict the scope of analysesSearch specifically for material master records via search helps
them to a particular material group.this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder plant(@Nullable String plant)
Original property name from the Odata EDM: Plant
You use the plant key to determine, for instance, which plant is to receive ordered goods.
code).this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder referenceDeliveryAddressID(@Nullable String referenceDeliveryAddressID)
Original property name from the Odata EDM: ReferenceDeliveryAddressID
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder incotermsClassification(@Nullable String incotermsClassification)
Original property name from the Odata EDM: IncotermsClassification
Incoterms specify internationally recognized procedures that the shipper and the receiving party must follow for the shipping transaction to be completed successfully.If goods are shipped through a port of departure, the appropriate Incoterm might be: FOB ("Free On Board"). You can provide further details (for example, the name of the port) in the secondary Incoterm field: FOB Boston, for example.
Commerce (ICC).this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder incotermsTransferLocation(@Nullable String incotermsTransferLocation)
Original property name from the Odata EDM: IncotermsTransferLocation
If the primary Incoterm is, for example, FOB ("Free on Board"), then the second field provides details of the port from which the delivery leaves (for example, "FOB Boston").
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder orderQuantityUnit(@Nullable String orderQuantityUnit)
Original property name from the Odata EDM: OrderQuantityUnit
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder targetQuantity(@Nullable BigDecimal targetQuantity)
Original property name from the Odata EDM: TargetQuantity
agreement (contract or scheduling agreement).this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder purchaseRequisition(@Nullable String purchaseRequisition)
Original property name from the Odata EDM: PurchaseRequisition
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder purchaseRequisitionItem(@Nullable String purchaseRequisitionItem)
Original property name from the Odata EDM: PurchaseRequisitionItem
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder schedAgrmtAgreedCumQty(@Nullable BigDecimal schedAgrmtAgreedCumQty)
Original property name from the Odata EDM: SchedAgrmtAgreedCumQty
If, in the case of procurement by means of scheduling agreements, differences should arise between the cumulative quantities recorded by your supplier and those determined by the SAP system, you can reconcile the figures with the supplier.As of the reconciliation date, Purchasing and the supplier then both work on the basis of the same, agreed figures.If no reconciliation date has been entered and an agreed cumulative quantity has been maintained, the latter serves as a starting value. This may be useful, for example, if you are creating a new scheduling agreement and wish to start with the cumulative quantity of a previous scheduling agreement with the supplier.Calculation:Starting value = cumulative received quantity + agreed cumulative quantityIf a reconciliation date has been entered and an agreed cumulative quantity maintained, the latter quantity enables you to represent the situation at the change of the fiscal year.Calculation:Cumulative scheduled quantity = cumulative received quantity - agreed cumulative quantity
been agreed between Purchasing and the supplier and is valid as of a certain date as the basis for the further ongoing computation of the cumulative quantities.this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder schedAgrmtCumQtyReconcileDate(@Nullable LocalDateTime schedAgrmtCumQtyReconcileDate)
Original property name from the Odata EDM: SchedAgrmtCumQtyReconcileDate
If no reconciliation date has been entered and an agreed cumulative quantity has been maintained, the latter quantity serves as a starting value.This may be useful, for example, if you are creating a new scheduling agreement and wish to start with the cumulative quantity of a previous scheduling agreement with the supplier.If a reconciliation date has been entered and an agreed cumulative quantity maintained, the latter quantity is a means of representing the situation at the change of the fiscal year. You can thus reset the cumulative scheduled quantity to 0 after the change of the year.
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder itemLastTransmissionDate(@Nullable LocalDateTime itemLastTransmissionDate)
Original property name from the Odata EDM: ItemLastTransmissionDate
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder noDaysReminder1(@Nullable BigDecimal noDaysReminder1)
Original property name from the Odata EDM: NoDaysReminder1
A negative number of days means that a reminder is to be issued to the supplier n days prior to a certain date (for example, the delivery date or the deadline for submission of quotations).A positive number of days means that a letter or message urging delivery or submission of a quotation etc. is to be issued n days after the due date.In the case of purchasing documents, the time intervals are defaulted from the purchasing info record or, if one does not exist, from the material master record.The basis for the reminder intervals is the delivery date or deadline for submission of quotations etc.In the event of several reminder levels, the days must be set out in ascending order of time, without gaps.In the event of a delay in delivery, you can send messages urging the supplier to deliver ordered materials a total of three times, at intervals of 10 days:Reminder 1: 10 days (after delivery date)Reminder 2: 20 days ( " " " )Reminder 3: 30 days ( " " " ).
termed "chasers", "hasteners" (UK) or "expediters" (USA)) are to be issued to the supplier.this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder noDaysReminder2(@Nullable BigDecimal noDaysReminder2)
Original property name from the Odata EDM: NoDaysReminder2
A negative number of days means that a reminder is to be issued to the supplier n days prior to a certain date (for example, the delivery date or the deadline for submission of quotations).A positive number of days means that a letter or message urging delivery or submission of a quotation etc. is to be issued n days after the due date.In the case of purchasing documents, the time intervals are defaulted from the purchasing info record or, if one does not exist, from the material master record.The basis for the reminder intervals is the delivery date or deadline for submission of quotations etc.In the event of several reminder levels, the days must be set out in ascending order of time, without gaps.In the event of a delay in delivery, you can send messages urging the supplier to deliver ordered materials a total of three times, at intervals of 10 days:Reminder 1: 10 days (after delivery date)Reminder 2: 20 days ( " " " )Reminder 3: 30 days ( " " " ).
termed "chasers", "hasteners" (UK) or "expediters" (USA)) are to be issued to the supplier.this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder noDaysReminder3(@Nullable BigDecimal noDaysReminder3)
Original property name from the Odata EDM: NoDaysReminder3
A negative number of days means that a reminder is to be issued to the supplier n days prior to a certain date (for example, the delivery date or the deadline for submission of quotations).A positive number of days means that a letter or message urging delivery or submission of a quotation etc. is to be issued n days after the due date.In the case of purchasing documents, the time intervals are defaulted from the purchasing info record or, if one does not exist, from the material master record.The basis for the reminder intervals is the delivery date or deadline for submission of quotations etc.In the event of several reminder levels, the days must be set out in ascending order of time, without gaps.In the event of a delay in delivery, you can send messages urging the supplier to deliver ordered materials a total of three times, at intervals of 10 days:Reminder 1: 10 days (after delivery date)Reminder 2: 20 days ( " " " )Reminder 3: 30 days ( " " " ).
termed "chasers", "hasteners" (UK) or "expediters" (USA)) are to be issued to the supplier.this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder purgDocOrderAcknNumber(@Nullable String purgDocOrderAcknNumber)
Original property name from the Odata EDM: PurgDocOrderAcknNumber
If you work exclusively with order acknowledgments and the supplier sends you one, enter an identifier defined within your firm (e.g. number assigned to incoming mail or date of receipt).NoteIf you work with several confirmation categories and a confirmation control key, you enter the confirmation data in the confirmation overview. This field is then for information only.
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder requirementTracking(@Nullable String requirementTracking)
Original property name from the Odata EDM: RequirementTracking
The requirement tracking number from the purchase requisition is copied to the purchasing documents (for example: RFQ or purchase order) created with reference to a purchase requisition.The requirement tracking number thus enables you to group together the purchasing documents that exist for a certain material requirement.
can relate to a requisition note (or requirement notice/slip) that was not generated in the system.this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder isOrderAcknRqd(@Nullable Boolean isOrderAcknRqd)
Original property name from the Odata EDM: IsOrderAcknRqd
acknowledged by the supplier.this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder purgDocEstimatedPrice(@Nullable Boolean purgDocEstimatedPrice)
Original property name from the Odata EDM: PurgDocEstimatedPrice
If you do not know the exact net price of a material, you can indicate that the price is an estimated price. In consequence, a greater price variance is tolerated during invoice verification than would be the case in the event of an exact net price.
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder priceIsToBePrinted(@Nullable Boolean priceIsToBePrinted)
Original property name from the Odata EDM: PriceIsToBePrinted
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder accountAssignmentCategory(@Nullable String accountAssignmentCategory)
Original property name from the Odata EDM: AccountAssignmentCategory
The account assignment category determines which account assignment data (such as cost center, account number and so on) is necessary for the item.
center).this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder multipleAcctAssgmtDistribution(@Nullable String multipleAcctAssgmtDistribution)
Original property name from the Odata EDM: MultipleAcctAssgmtDistribution
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder partialInvoiceDistribution(@Nullable String partialInvoiceDistribution)
Original property name from the Odata EDM: PartialInvoiceDistribution
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder netPriceAmount(@Nullable BigDecimal netPriceAmount)
Original property name from the Odata EDM: NetPriceAmount
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder netPriceQuantity(@Nullable BigDecimal netPriceQuantity)
Original property name from the Odata EDM: NetPriceQuantity
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder orderPriceUnit(@Nullable String orderPriceUnit)
Original property name from the Odata EDM: OrderPriceUnit
Invoices are created using price units and purchase order price units which constitute the basis for value postings.They can be stored in the purchasing info record.A material or commodity (for example, oil) can be ordered by the liter, but the supplier's invoice shows a price of 2 dollars per kilogram.You enter 10 l as the order quantity and order unit, but specify 2 dollars per kg as purchase order price and purchase order price unit.In addition, you enter the conversion factor "order unit -> purchase order price unit" (for example 2 l per 1 kg) in the "details" data of the purchase order item.
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder productType(@Nullable String productType)
Original property name from the Odata EDM: ProductType
In the product type group you choose to either procure a Material (by entering blank or 1) or a Service (by entering 2).The procurement process is different for materials and services. For example, you can only maintain the field Service Performer when you purchase a service.You also use the product type group Service to control that a service entry sheet can be created as a follow-on document of a purchase order.The selection field Product Type Group is available for the following item categories:StandardThird-partyLimitIn the product master data, the assigned material type defines the product type group, that is, whether the product is a material or a service. This means that whenever you select, for example, Service as the product type group in your purchasing document item, you can only enter the number of a product with the same product type group in the Material field of the item.And the other way round: if you enter a product number in the Material field, for example, in a purchase order item, the product type group is derived automatically from the material type assigned to the product master. In this case, you cannot manually maintain the product type group in the purchase order item.If you donĀ“t enter a product number, but create a free-text item or a limit item, you have to maintain the product type group manually.
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder materialType(@Nullable String materialType)
Original property name from the Odata EDM: MaterialType
The material type defines certain attributes of the material and has important control functions.
trading goods.this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder storageLocation(@Nullable String storageLocation)
Original property name from the Odata EDM: StorageLocation
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder documentCurrency(@Nullable String documentCurrency)
Original property name from the Odata EDM: DocumentCurrency
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder isInfoRecordUpdated(@Nullable String isInfoRecordUpdated)
Original property name from the Odata EDM: IsInfoRecordUpdated
The purchasing info record for this supplier and material is to refer to this PO item, andThe item is to be valid for the entire purchasing organization or just for the plant.The indicator determines which prices and conditions are suggested in future PO items.Prices and conditions can apply to an entire purchasing organization or to a single plant within a purchasing organization.For example, if you create a purchase order for a plant for which an info record has been defined at plant level, the purchase order is based on the conditions in the plant info record and not on the conditions that apply to the purchasing organization.Enter the relevant plant key:AUpdating of the document number is effected at plant level as long as there is a purchasing info record at plant level. Otherwise the document number is updated at purchasing organization level.BUpdating is effected at plant level if plant conditions are allowed for the plant.CUpdating is effected without plant data if plant conditions are not necessary for the plant.The level at which updating of the document number may be effected is defined for each plant.
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder purchasingInfoRecord(@Nullable String purchasingInfoRecord)
Original property name from the Odata EDM: PurchasingInfoRecord
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder ordPriceUnitToOrderUnitDnmntr(@Nullable BigDecimal ordPriceUnitToOrderUnitDnmntr)
Original property name from the Odata EDM: OrdPriceUnitToOrderUnitDnmntr
order unit: purchase order price unit.Enter the quantity in the order unit that applies for the quantity in the purchase order price unit.You want to order 200 l of a liquid. However, the supplier sells the liquid by the kilogram. 1 kg of this liquid corresponds to 4 l.As conversion factor, enter:Order quantity/order unit Order price qty./order price unit4 l --> 1 kg
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder orderPriceUnitToOrderUnitNmrtr(@Nullable BigDecimal orderPriceUnitToOrderUnitNmrtr)
Original property name from the Odata EDM: OrderPriceUnitToOrderUnitNmrtr
Enter the quantity in the PO price unit that applies for the quantity in the order unit.You want to order 200 l of a liquid. However, the supplier sells the liquid by the kilogram. 1 kg of this liquid corresponds to 4 l.As conversion factor, enter:Order quantity/order unit Order price qty./order price unit4 l --> 1 kg
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder purchasingDocumentDeletionCode(@Nullable String purchasingDocumentDeletionCode)
Original property name from the Odata EDM: PurchasingDocumentDeletionCode
You can set the deletion indicator by choosing Edit -> Delete if:You want to cancel an itemAn item is closed and can be archivedYou can set the blocking indicator by selecting the item and then choosing Edit -> Block if you do not want to allow subsequent functions for the item. Note that you must manually remove the indicator as soon as subsequent functions are allowed again.You have entered a purchase order item by mistake. You cancel it by setting the deletion indicator.A purchase order item has been delivered, invoiced, and paid for, and can now be archived. You can set the deletion indicator.
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder underdelivTolrtdLmtRatioInPct(@Nullable BigDecimal underdelivTolrtdLmtRatioInPct)
Original property name from the Odata EDM: UnderdelivTolrtdLmtRatioInPct
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder overdelivTolrtdLmtRatioInPct(@Nullable BigDecimal overdelivTolrtdLmtRatioInPct)
Original property name from the Odata EDM: OverdelivTolrtdLmtRatioInPct
If you have set the indicator in the Partial delivery/Item field to 'D' (partial delivery allowed), this takes priority. It makes no sense to define a tolerance limit for overdelivery in such case.
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder unlimitedOverdeliveryIsAllowed(@Nullable Boolean unlimitedOverdeliveryIsAllowed)
Original property name from the Odata EDM: UnlimitedOverdeliveryIsAllowed
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder stockType(@Nullable String stockType)
Original property name from the Odata EDM: StockType
If the material is subject to quality inspection, a goods receipt is posted to stock in quality inspection.
goods issue).this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder taxCode(@Nullable String taxCode)
Original property name from the Odata EDM: TaxCode
Tax codes are unique per country. The tax rate calculation rules and further features are stored in a table for each tax code.For tax-exempt or non-taxable transactions, you should use tax codes with a 0 percentage rate if the corresponding transactions are to be displayed in the tax returns.You must define new tax codes if tax rates are changed by the state. The old codes with the old tax rates must remain in the system until no more open items which use this tax code exist.
the tax authorities.this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder taxCountry(@Nullable String taxCountry)
Original property name from the Odata EDM: TaxCountry
When the Registration for Indirect Taxation Abroad (RITA) is enabled,you can designate a tax country for the calculation and reporting oftaxes. RITA allows you to do this without having a separate companycode in those countries. When RITA is enabled, tax is calculatedbased on the tax country rather than the company code country.Please note that the tax country must be supplied in transactionssubject to tax calculation.
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder taxDeterminationDate(@Nullable LocalDateTime taxDeterminationDate)
Original property name from the Odata EDM: TaxDeterminationDate
The system determines the date for calculating time-dependent tax (depending on the Customizing settings in the company code) either from the posting date or from the document date.If you want to use a date which is neither the posting date nor the document date for calculating tax on sales/purchases, you can enter the alternative date here.Enter the alternative date.
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder shippingInstruction(@Nullable String shippingInstruction)
Original property name from the Odata EDM: ShippingInstruction
Enter the key for the relevant shipping instructions.
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder isInfoAtRegistration(@Nullable String isInfoAtRegistration)
Original property name from the Odata EDM: IsInfoAtRegistration
This indicator is transferred to method FUNCTION_AFTER_REGISTRATION of BADI BORGR_REGISTRATION during registration and can be used to trigger actions (for example, Workflow, e-mail to the MRP controller).
notifies when inbound deliveries for this item are registered in the goods receipt office.this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder goodsReceiptIsExpected(@Nullable Boolean goodsReceiptIsExpected)
Original property name from the Odata EDM: GoodsReceiptIsExpected
DependenciesIn the processing of production and process orders, the indicator specifies whether a goods receipt is allowed and expected for the order item.If the indicator is set, the order item is relevant to inventory management. The indicator is set during the creation of the order if the order is settled in respect of a material or a sales order item.
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder goodsReceiptIsNonValuated(@Nullable Boolean goodsReceiptIsNonValuated)
Original property name from the Odata EDM: GoodsReceiptIsNonValuated
Set the indicator if goods receipts involving this material are not to be valuated. The valuation of the purchase order item will then take place at the time of invoice verification.NoteIf the indicator has been set for an item with the material type non- valuated, the quantity recorded in Inventory Management can differ from the value in Financial Accounting during the period between goods receipt and invoice receipt, since the value is not updated until the invoice is posted in Financial Accounting.
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder invoiceIsExpected(@Nullable Boolean invoiceIsExpected)
Original property name from the Odata EDM: InvoiceIsExpected
If the indicator is not set, the goods are to be delivered free of charge.
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder invoiceIsGoodsReceiptBased(@Nullable Boolean invoiceIsGoodsReceiptBased)
Original property name from the Odata EDM: InvoiceIsGoodsReceiptBased
purchase order item or invoice item.this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder evaldRcptSettlmtIsAllowed(@Nullable Boolean evaldRcptSettlmtIsAllowed)
Original property name from the Odata EDM: EvaldRcptSettlmtIsAllowed
You set this indicator if you do not expect the supplier to send you an invoice. Instead, the invoice is to be generated by the system based on the data available in the purchase order and the goods receipt document.You can use the indicator Evaluated Receipt Settlement (ERS) for the procurement of materials and services.(In the case of services performed, you create a service entry sheet. Once it has been approved, the system creates a goods receipt in the background.)If you want to use the Evaluated Receipt Settlement (ERS) functionality, you have to set the ERS indicator both in the supplier master data and in the purchase order item. Please note: You have the option to select or deselect the indicator in the purchase order only if it is set in the supplier master data.Where to set the indicator:Supplier master data:Use the Maintain Business Partner app andgo to your supplierĀ“s purchasing data that is specific for the respective purchasing organization.Purchase order item:In the purchase order item, you can use the indicator in all available item categories, except in limit items for materials (product type group 1 - as no goods receipt is expected for these items).Use the Manage Purchase Orders app or the Create Purchase Order - Advanced app andalso set the indicators Goods Receipt and Goods-Receipt-Based Invoice Verification on item level.
materials or services has been posted.this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder minRemainingShelfLife(@Nullable BigDecimal minRemainingShelfLife)
Original property name from the Odata EDM: MinRemainingShelfLife
The period (day, week, month, year) depends on the entry in the Period indicator field.
accepted by the system.this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder qualityMgmtCtrlKey(@Nullable String qualityMgmtCtrlKey)
Original property name from the Odata EDM: QualityMgmtCtrlKey
If you activate the indicator for QM in procurement in the material master record at the client level, you must also store a control key at the plant level for quality management in procurement.Depending on the control indicators in the control key, you may have to maintain additional data.
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder qualityCertificateType(@Nullable String qualityCertificateType)
Original property name from the Odata EDM: QualityCertificateType
In procurement, you can use the certificate type to control a number of functions that have been defined for the processing of certificate receipts. The certificate type is specified in the QM data of the material for this purpose.For certificate creation, you can use the certificate type to control the statuses in the certificate profile. The certificate type is specified in the certificate profile.The entry of a certificate type in the Quality Management view of the material only takes effect if you also set the indicator for the activation of QM in procurement.
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder schedAgrmtCumulativeQtyControl(@Nullable String schedAgrmtCumulativeQtyControl)
Original property name from the Odata EDM: SchedAgrmtCumulativeQtyControl
You can use the Control Type to define how cumulative quantities in the scheduling agreement release are determined:Based on inbound deliveriesBased on goods receipts
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder cumulativeQuantityIsNotSent(@Nullable Boolean cumulativeQuantityIsNotSent)
Original property name from the Odata EDM: CumulativeQuantityIsNotSent
Setting this flag for a scheduling agreement item has the following consequences:When a scheduling agreement release is created in SAP APO, no cumulative quantities are sent to the vendor for this item on release.No agreed cumulative quantity is calculated in the Set/Reset Agreed Cumulative Quantities and Reconciliation Date function (transaction ME88).No vendor cumulative quantity is expected in an advanced shipping notification item that is related to the scheduling agreement item.On creation of an inbound delivery, no cumulative quantity is calculated for items that are related to the scheduling agreement item.No Cumulative Quantity Imbalance Alert is raised in Inventory Collaboration Hub (ICH) for an inbound delivery item that is related to the scheduling agreement item.You can define whether or not cumulative quantities are sent in the SA release, regardless of the control type that you have chosen.This flag is transferred to SAP APO and is displayed there in the master data.
used.this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder schedgAgrmtRelCreationProfile(@Nullable String schedgAgrmtRelCreationProfile)
Original property name from the Odata EDM: SchedgAgrmtRelCreationProfile
The creation periodicity of the releases (scheduling agreement delivery schedules), i.e. the period in which releases against a scheduling agreement are created and transmitted to the supplier, andThe way in which the quantities transmitted to the supplier are aggregated (starting from the current creation date of the release)Example:The creation periodicity for a scheduling agreement for which delivery schedule lines have been maintained over two years provides that releases are created weekly from 1.1. to 12.31 of the first year.The release quantities are to be aggregated as follows:For a period of 10 days starting from the current date of release creation, no aggregation; from the tenth to the thirtieth day, on a daily basis; and from the thirtieth day to the sixtieth day, on a monthly basis.
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder isRelevantForJITDelivSchedule(@Nullable String isRelevantForJITDelivSchedule)
Original property name from the Odata EDM: IsRelevantForJITDelivSchedule
for a material specified in a purchase scheduling agreement.this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder nextFcstDelivSchedSendingDate(@Nullable LocalDateTime nextFcstDelivSchedSendingDate)
Original property name from the Odata EDM: NextFcstDelivSchedSendingDate
This date is taken into account in the process of automatic release (delivery schedule) generation. If the indicator is set to "With next creation date", only those scheduling agreement items with respect to which the creation date is earlier than the current date are chosen for release generation.
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder nextJITDelivSchedSendingDate(@Nullable LocalDateTime nextJITDelivSchedSendingDate)
Original property name from the Odata EDM: NextJITDelivSchedSendingDate
This date is taken into account in the process of automatic release (delivery schedule) generation. If the indicator is set to "With next creation date", only those scheduling agreement items with respect to which the creation date is earlier than the current date are chosen for release generation.
this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder scheduleLineFirmOrderInDays(@Nullable BigDecimal scheduleLineFirmOrderInDays)
Original property name from the Odata EDM: ScheduleLineFirmOrderInDays
! Firm zone I Trade-off zone I!------------------!-----I------------------------I--> Days! ! I I! !SA release creation date Schedule line dateFirm zone: (go-ahead for production)If the date of a schedule line lies within the firm zone, the supplier has the go-ahead to produce the relevant quantity with the assurance that the orderer will bear any and all material and production costs associated with the scheduled quantity in the event of subsequent cancellation by the latter.Trade-off zone: (go-ahead for procurement of input materials)If the date of a schedule line lies within the trade-off zone, the supplier has the go-ahead to purchase any input materials necessary to produce the scheduled quantity. The orderer will recompense him in full for such outlay (but not for any other production costs) in the event that he should subsequently cancel the scheduled quantity.Schedule lines that lie beyond the firm and trade-off zones fall within the planning zone (forecast zone) and are for rough guidance only, being without any commitment on the part of the orderer.In the "Firm zone" field, enter the number of calendar days (calculated from the SA release creation date) after which the firm zone ends and the trade-off zone begins.In the "Trade-off zone" field, enter the number of calendar days (calculated from the SA release creation date) after which the trade-off zone ends.If the firm zone ends in one month, enter 30 in the "Firm zone" field.If the trade-off zone ends one month after the firm zone, enter 60 in the "Trade-off zone" field.In the standard system, the end date for production go-ahead is calculated at the time of SA release creation from the firm zone. The end date for material go-ahead is calculated from the trade-off zone. These dates are displayed in the header of the relevant scheduling agreement release.When an SA release is transmitted to the supplier via IDoc, the end dates for production and material go-ahead are determined from the firm and trade-off zones and the SA release creation date. These dates are shown in the sales scheduling agreement in the SA release header in the relevant fields (End of Production Go-Ahead, End of Material Go-Ahead).
release are classified as firm or semi-firm.this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder schedLineSemiFirmOrderInDays(@Nullable BigDecimal schedLineSemiFirmOrderInDays)
Original property name from the Odata EDM: SchedLineSemiFirmOrderInDays
! Firm zone I Trade-off zone I!------------------!-----I------------------------I--> Days! ! I I! !SA release creation date Schedule line dateFirm zone: (go-ahead for production)If the date of a schedule line lies within the firm zone, the supplier has the go-ahead to produce the relevant quantity with the assurance that the orderer will bear any and all material and production costs associated with the scheduled quantity in the event of subsequent cancellation by the latter.Trade-off zone: (go-ahead for procurement of input materials)If the date of a schedule line lies within the trade-off zone, the supplier has the go-ahead to purchase any input materials necessary to produce the scheduled quantity. The orderer will recompense him in full for such outlay (but not for any other production costs) in the event that he should subsequently cancel the scheduled quantity.Schedule lines that lie beyond the firm and trade-off zones fall within the planning zone (forecast zone) and are for rough guidance only, being without any commitment on the part of the orderer.In the "Firm zone" field, enter the number of calendar days (calculated from the SA release creation date) after which the firm zone ends and the trade-off zone begins.In the "Trade-off zone" field, enter the number of calendar days (calculated from the SA release creation date) after which the trade-off zone ends.If the firm zone ends in one month, enter 30 in the "Firm zone" field.If the trade-off zone ends one month after the firm zone, enter 60 in the "Trade-off zone" field.In the standard system, the end date for production go-ahead is calculated at the time of SA release creation from the firm zone. The end date for material go-ahead is calculated from the trade-off zone. These dates are displayed in the header of the relevant scheduling agreement release.When an SA release is transmitted to the supplier via IDoc, the end dates for production and material go-ahead are determined from the firm and trade-off zones and the SA release creation date. These dates are shown in the sales scheduling agreement in the SA release header in the relevant fields (End of Production Go-Ahead, End of Material Go-Ahead).
release are classified as firm or semi-firm.this
.@Nonnull public SchAgrmtItem.SchAgrmtItemBuilder firmTradeOffZoneBindMRP(@Nullable String firmTradeOffZoneBindMRP)
Original property name from the Odata EDM: FirmTradeOffZoneBindMRP
during the planning run.this
.@Nonnull public SchAgrmtItem build()
Copyright © 2020 SAP SE. All rights reserved.