Checking and Releasing Log Sheets

Prerequisites

All measurements in the work area for which you want to release the log sheet are in a final status. For more information, see Status Editing for Measurements .

You have opened the measurement project you want to edit as described under Accessing Measurement Management .

Caution Caution

After you have released the log sheet, you can no longer change the data in the corresponding measurements. You cannot undo the release of the log sheet.

End of the caution.

Procedure

  1. In the navigation area, click the log sheet you want to edit.

  2. In the application area, check the data that exists on the various tab pages. Note that for measurements that have the status Released or Partial Measurement , you can reset the status of the measurement if necessary and then make corrections.

  3. If necessary, note the measurements whose data is to be corrected.

  4. In the project tree, open the measurements you want to change. Reset the status using with the quick info text Measurement Results Recorded and make your changes. Then release the measurements again using with the quick info text Release or set another final status by choosing Start of the navigation path Measurement Project Next navigation step Status Switch Next navigation step Measurement End of the navigation path (see Status Editing for Measurements ).

  5. In the navigation area, click the work area to which the log sheet belongs and change to the Close tab page in the application area.

  6. Enter the date of any follow-on measurement or set the No Follow-On Meas. indicator.

    If you set the No Follow-On Meas. indicator, the work area will not be taken into account when a follow-on project is created. It is also not relevant for date tracking using the report program List Monitoring Dates .

  7. Enter a comment as a user-defined text if required and choose Log Sheet . Save your entries.

  8. Repeat steps 1. through 7. for all other log sheets you want to release.