Integration of Safety Measures in Other SAP Components This process allows you to transfer technical
industrial hygiene and safety measuresto other SAP components as tasks and read them back to
Industrial Hygiene and Safety
when they are completed. This process is explained here using the
Plant Maintenance
(PM) component as an example.
In the standard system this process is intended only for safety measures of the category
technical
. By making appropriate settings in Customizing you can also use it for additional or other safety measure categories. You make the necessary settings in Customizing for
Industrial Hygiene and Safety
under
Specify Safety Measure Categories
.
In Customizing for
Basic Data and Tools
under
Specify Environment Parameters
you must have assigned the
notification type you use for maintenance notifications from
Industrial Hygiene and Safety
to the environment parameter IHS_NOTIFICATION_TYPE. See also
Configure Maintenance Processing and Service Processing Customizing
in Customizing for
Industrial Hygiene and Safety
.
You must have scheduled the return report program REHS_GET_ACTIONS_FROM_PM. We recommend that you schedule the report program once daily to run directly or as a background job. For more information, see the documentation for the report.
Industrial Hygiene and Safety |
Integration |
Maintenance Processing |
|---|---|---|
Entering one or more technical safety measures and creating a corresponding maintenance notification |
Þ Transfer of the notification |
Processing the notification and assigned tasks |
Updating the original safety measures Notifying by e-mail of person who created the maintenance notification |
Ü Reading back |
Note: For the notification to be read back, all tasks in the notification must be completed or deleted. |
Effectiveness check |
You create one or more
safety measures
of the safety measure category
technical
.
You can only transfer safety measures to
Plant Maintenance
that do not have the status
Task Completed
(TSCO).
Select the safety measures you want to transfer and create a maintenance notification using
with the quick info text
Create Notific.
Note
If the work area to which the safety measures relate contains a functional locationor equipmentas an integration object, you can specify these as reference objects for the notification.
If a
functional location
is specified, the plant maintenance system is determined using the
Functional Location Plant
field.
The system switches the status of the safety measures to
In Process
Outside EH&S
(IPEX).
For every safety measure transferred, the
pushbutton with the quick info text
Notif
.
also appears in the list of safety measures: you can use it to display the notification together with the safety measures.
Plant Maintenance
processes the notification you created.
Caution
As long as tasks (safety measures) are being processed by
Plant Maintenance
, they cannot be changed in
Industrial Hygiene and Safety
.
When all tasks in the notification are completed and the report program
REHS_GET_ACTIONS_FROM_PM
is executed, the notification is read back to
Industrial Hygiene and Safety
. The original data for the safety measures is then updated.
Note
Even if a task was deleted by
Plant Maintenance
, this is taken into account when the tasks are read back. The safety measure is not deleted in
Industrial Hygiene and Safety
but is assigned the status
Deleted Outside EH&S
(DLEX).
If the whole
maintenance notification
deleted in
Plant Maintenance
, the status DLEX is also set.
For more information, see the documentation for
REHS_GET_ACTIONS_FROM_PM
and
Status Editing for Industrial Hygiene and Safety Measures
.
When you have read the notification back to
Industrial Hygiene and Safety
, you will find an e-mail in your SAPoffice inbox that tells you which safety measures were returned.
Check the effectiveness of the safety measures. To do this you can edit the following fields for each safety measure using
with the quick info text
Addit. Information
:
Execution
(date, time)
Checks
(date, time)
Effectiveness
Administrator
Resp. for check