Aisles and Levels Accessible by Communication Point
Use
In the automatic storage retrieval system, rough destination bin determination takes place at communication points (CPs) that are responsible for aisle decisions (see Aisle Decision Points). At each of the CPs the system must know which aisles and levels are accessible. In addition, the system must know the resource pick-up points that will be passed on the way to the aisles and levels and that will be checked for exceptions and capacity. For more information about resource pick-up points, see MFS Resource Pick-Up Points.
You define the aisles and levels to be accessible by a CP in Customizing for Extended Warehouse Management under .
Example
The system can access aisles 1 to 5 at the first aisle decision point (AD1) of your automatic storage retrieval system. If a case passes CP AD1 and is directed to aisle 1, it must pass resource pick-up point PS1 as an intermediate CP. At CP AD1 the system checks whether resource pick-up point PS1 has any exceptions and free capacity. If one of these is not fulfilled, the case is not directed to aisle 1. Instead, the system determines another rough destination bin in another aisle.
Note that at the last CP before the aisle (CP PS1) where the putaway warehouse task is created (resource pick-up point), an intermediate CP must not be entered.
|
Warehouse |
PLC |
Communication Point |
PLC of Intermediate CP |
Intermediate CP |
Storage Type |
Aisle |
Level |
|---|---|---|---|---|---|---|---|
|
0001 |
MFS001 |
AD1 |
MFS001 |
PS1 |
0016 |
1 |
|
|
0001 |
MFS001 |
AD1 |
MFS001 |
PS2 |
0016 |
2 |
|
|
0001 |
MFS001 |
AD1 |
MFS001 |
PS3 |
0016 |
3 |
|
|
0001 |
MFS001 |
AD1 |
MFS001 |
PS4 |
0016 |
4 |
|
|
0001 |
MFS001 |
AD1 |
MFS001 |
PS5 |
0016 |
5 |
|
|
0001 |
MFS001 |
PS1 |
0016 |
1 |
|||
|
0001 |
MFS001 |
PS2 |
0016 |
2 |
|||
|
0001 |
MFS001 |
PS3 |
0016 |
3 |
|||
|
0001 |
MFS001 |
PS4 |
0016 |
4 |
|||
|
0001 |
MFS001 |
PS5 |
0016 |
5 |
Note: If you do not specify a level, then all levels are accessible.