Workload Distribution
You can use workload distribution to distribute the workload in your warehouse as evenly as possible over the available time slot, so that you do not have to use extra warehouse workers to cope with unnecessary peaks in the workload. Labor Demand Planning carries out workload distribution as follows.
When the workload is aggregated by time slot, it is either aggregated by the planned start time or by the planned completion time. Either way there is a peak at the start or at the completion time; the time between is not taken into account. The workload in the following chart represents a wave which has its planned starting time at 10 a.m. and its planned completion time at 2 p.m.:
There is either a peak at the planned start time, meaning that the entire workload is processed as early as possible in the first time slot, or there is a peak at the planned completion time, meaning that the entire workload is processed as late as possible in the last time slot.
To even out these peaks, the workload is distributed over the available time slots:
Now there is a constant amount of workload over the time, which better suits the available workforce, as the workforce is also available constantly rather than only at certain peaks.
Although the distribution is straightforward in this example, we can look at the progress of workload completion over time.
In the following chart, for the maximum completion curve, the planned start times of each time slot are summed up over time. It limits the maximum amount of workload that can be processed as there is simply not more released. For the minimum completion curve, the planned completion times of each time slot are summed up over time. It marks the minimum amount of workload that has to be processed in order to stay on schedule. This means for this example that the workload amount of 10 can be processed at any point in time between 10 a.m. and 2 p.m. The equal distribution curve fits between the minimum and maximum curves and is therefore a feasible way to process the workload.
In the following example the gap between the maximum and minimum curves gets narrower. The workload shown in the following chart represents four waves, each of which has its planned completion time in the time slot immediately after the time slot of its planned start time.
This leads to the following minimum and maximum completion curves:
As not all the workload can be processed immediately at the beginning, the maximum completion curve is more restricting. At the same time every hour some of the workload has to be completed, according to its planned completion times. The equal distribution curve still fits between the boundaries which leads to the following workload distribution across time slots:
This changes in the final example. The following workload is again caused by four waves which have their planned completion time in the time slot immediately after the time slot of the planned start time. Here, however, the waves contain different amounts of workload.
This leads to the following minimum and maximum curves:
As there is more workload to be completed in the morning, the equal distribution curve violates the lower boundary of the minimum completion curve and is therefore not a feasible way of processing the workload. To fix this, the equal distribution curve is adapted so that it does not fall below the minimum completion curve and is therefore feasible again. In addition, a local equal distribution between the first three time slots is applied.
For the distributed workload per hour, this means that there is not the same amount of workload for all the time slots but it is equally distributed within the boundaries laid out by the planned start and completion times of the workload.