Internal Process Codes
You can use internal process codes to define how the system is to react to exceptions.
|
Process Code |
Description |
Context/Step |
Use |
|---|---|---|---|
|
BOVF |
The PLC reports a telegram buffer overflow. |
MF1/A0 |
The SAP Extended Warehouse Management (SAP EWM) system ignores the confirmation telegram according to the wait time that has been set. As a result, the telegram is automatically repeated. |
|
COMM |
Set status on communication channel. |
MF1/A0 |
The SAP EWM system does not trigger any additional action. The system sets the status on the communication channel. You can utilize the options for exception handling (for example, alert or workflow). |
|
REST |
Restart of communication channel. |
MF1/A0 |
The SAP EWM system stops the affected communication channel and restarts it. |
|
SEQW |
The PLC rejects the run number of the telegram sent by the SAP EWM system. (For example, because the PLC memory has been deleted and the PLC is therefore no longer able to decide whether or not the run number received is valid.). |
MF1/A0 |
The SAP EWM system resets the run number and resends the current telegram with the sequence number 0. The sequence number 0 counts as a reset and is always accepted by the recipient. |
|
CRCL |
Move HU to clarification storage bin |
MF2/A0 MF2/A1 MF3/A0 MF5/A0 MF5/A1 MF6/A0 |
The SAP EWM system updates the exception on the HU. It cancels all open warehouse tasks for the HU and creates a new warehouse task for the HU for the clarification bin. |
|
NSND |
A communication point or a segment is malfunctioning, locked, or has no free capacity. You nevertheless want to create a warehouse task, which you do not, however, want to send to the PLC. |
MF2/A0 MF2/A1 MF4/A0 MF4/A1 MF5/A0 MF5/A1 |
The SAP EWM system creates the warehouse task for the HU but does not send it. |
|
STAY |
A communication point or a segment is malfunctioning, locked, or has no free capacity. You therefore do not want to generate a warehouse task. |
MF2/A0 MF2/A1 MF4/A0 MF4/A1 MF5/A0 MF5/A1 |
The SAP EWM system does not create a warehouse task for the HU. |
|
BINE |
A stacker crane reports that the storage bin passed on as the From bin in a warehouse task is physically empty. |
MF3/A0 |
The SAP EWM system cancels all warehouse tasks for the HU and attempts to create new warehouse tasks. |
|
BINO |
A stacker crane reports that the storage bin passed on as the To bin in a warehouse task is physically occupied. |
MF3/A0 |
The SAP EWM system attempts to determine a new, empty storage bin. As a result, the current warehouse task is changed and the telegram with the new data immediately sent. |
|
HUNO |
a) The PLC reports that an unidentifiable HU has passed a scanner. b) The PLC reports an HU that is not known in SAP EWM. |
MF3/A0 |
The SAP EWM system creates a new, empty HU and conveys it to the clearing bin. |
|
NOCN |
Cancellation not possible |
MF3/A0 |
The system changes the indicator WT to Subsystem in the warehouse task from 1 - Cancellation Request Relevant to External System to X - WT Sent to External System. |