Transformation You use this function to generate master recipes from general recipes. The general recipe serves as a template.
See Transformation Process .
The system generates a master recipe from a general recipe. In doing so, the system transforms general recipe stages to master recipe operations and general recipe operations to master recipe phases. General recipe actions and process parameters provide information for process instructions in the master recipe. Resource assignments are also determined here.

Resources
The first equipment requirement in the general recipe stage provides information for the resource selection criteria in the master recipe operation. The system copies the classification of the equipment requirements of each general recipe stage to the resource selection criteria of each relevant master recipe operation.
Using the equipment requirements for the general recipe, the system can assign a primary resource to a master recipe operation, or the secondary resource of a master recipe operation, or a master recipe phase. One primary resource is allowed for each master recipe operation. The first equipment requirement in each general recipe stage determines the primary resource. The remaining equipment requirements in the general recipe stage determine the secondary resource for the master recipe operation.
The equipment requirements for the general recipe operation determine the secondary resource in the master recipe phase.
The system does not take the equipment requirements at general recipe and process action level into account in the transformation.
The system generates the bill of material from the formula of the general recipe or from the formulas of the selected general recipe stages. If the formula is assigned to the process stage, the system aggregates the formulas of the selected stages. The bill of material is then generated from this aggregated formula.
The system assigns the material components in the generated bill of material to the master recipe operations or phases. This depends on the formula components that were assigned to the stages or operations in the general recipe.
If the material components are not assigned to the general recipe operation, the system assigns them to the general recipe stage if the formula is stage-dependent. The material components are assigned to the relevant master recipe operations in the transformation.
The system can display input and output streams of the formula in the bill of material by transforming the input and output streams to bill of material items of the type "intra material".
Note
To be able to use this function, you have to define transformation groups beforehand in Customizing for the Transformation of General Recipe to Master Recipe.
When the system assigns QM data to the stream, it creates an additional phase in the master recipe operation. It copies the QM data to the inspection characteristics in the phase.
Depending on the settings you made in Customizing for the environment parameters in Quality Management, the system either uses the central system or the target system of the master inspection characteristicsin the transformation.
You can enter three rows of long text for the QM data in Recipe Management. If long text objects exist in the target system for master inspection characteristics, the system adds the QM data long texts for the general recipe to the existing long text. If no long text objects exist, the system creates a new long text object for the master inspection characteristics.
You can assign process parameters to the general recipe, the process stage, the process operation, the process action, and the equipment requirement.
To transform process parameters to process instructions, you have to make sure that you have assigned the correct ABAP class to the object type PROCPARA in the transformation group. You do this in Customizing for Transformation of General Recipe to Master Recipe under
Define Transformation Groups
.
SAP supplies the ABAP class CL_RMXM_ROM_PP with the standard system.
The system transforms process parameters in the master recipe as follows:
Process Parameter Assigned to: |
Is Mapped to: |
|---|---|
Recipe |
First phase of the first master recipe operation |
Equipment for recipe |
Not transformed |
Process stage |
First phase of the corresponding master recipe operation |
Equipment for process stage |
First phase of the corresponding master recipe operation |
Process operation |
Corresponding phase |
Equipment for process operation |
Corresponding phase |
Process action |
Superior phase |
Equipment for the process action |
Superior phase |
For more information, see: