Manage Work Center Utilization: Existing Schedules are now Grouped
When you are assigning operations and choosing which schedule to assign them to, you can immediately see in the list of exisiting schedules, whether they were created manually, or generated automatically by a recurring application job.
Technical Details
|
Type |
New |
|
Functional Localization |
Not applicable |
|
Scope Item |
43R (Maintenance Resource Scheduling) |
|
Technical Object Name |
App ID: F2222 |
|
Preparation Required |
No |
|
Latest Reference Content Version Required |
No |
|
Application Component |
CA-RSH-EAM (Resource Scheduling for Enterprise Asset Management) |
|
Valid as Of |
SAP S/4HANA Cloud 2308 |
Additional Details
When you select one or more operations in the Manage Work Center Utilization app and then click Add to Schedule, all existing schedules are now grouped together based on how they were created:
-
Schedules that were automatically generated by a recurring application job are grouped together under the job name.
-
Manually created schedules are grouped under Others.