Starting Personnel Cost PlanningThe process of starting new personnel cost planning scenarios varies slightly depending on the source of information that you use – projected pay, basic pay, or payroll results.
Choose
The main Personnel Cost Planning screen appears.
Choose
or
Payroll results
or
Basic pay
The Planning Basis <name of method> screen appears
Identify which objects should be included in the scenario. You can do this by specifying:
A plan version
The organizational units that you want to work with
A selection period – the system only selects organizational units that are valid during the time frame specified.
Indicate how the system should interpret the above object selection by specifying the depth of the organizational structure and whether organizational changes should be included in the calculations.
Enter a frequency in the
Period
field and a currency to Indicate how the system should calculate the scenario.
In the
Editing
group box, determine how the system should display the results.
Choose
Create
The Change Personnel Costs: Overview Organizational Units screen appears
You can now edit your scenario and experiment with what if scenarios.
See also: