Planning Profiles
In this step, you:
- change existing plan profiles
To be able to carry out project revenue
planning, you must create a plan profile or use an existing one.
The following parameters are relevant to
project cost planning:
Here, you define the
following:
- period into the past, from the start year, for
which you can plan
- period into the future, from the start year,
for which you can plan
- planning of overall and/or annual
values
- standard view displayed as well as the planned
value when you access the function
- decimal places and scaling factor as default
values
- Planning in all WBS elements or only in
planning elements
- Bottom-up planning within structure-oriented
planning
The indicator
determines whether planning is by the bottom-up procedures:
If you set the indicator, the system automatically totals up the cost values
each time you save and check them. The higher-level WBS element receives the
total plan values for the WBS elements beneath it as its structure plan
value.
Prerequisites
You must first have processed the following
menu items and parameters, so that they are available as default
values:
Revenue elements are
cost elements defined with cost element type 11.
Action
1. Use "Detail"
to check the plan profiles delivered as standard in the SAP
System.
2. Change the
details as necessary in the plan profiles, or create new ones as
appropriate.
Additional
information
You have the following alternative ways of
assigning a plan profile to a project:
- as a default value in the Project System
configuration menu
- in the project profile for a project
definition (Operative structures)
- in the project profile for a standard project
definition (Basic data)
- in the Project System application
menu
- in the project definitioan control data, if
you have not stored a plan profile in the project profile. (In the area menu,
choose Operative structures -> Work breadown struc -> Change ->
Detail -> Control -> Plan profile).