Define options
profiles
In this step, you define the options profiles
that determine some essential characteristics of the lists and
graphics.
In the option profile, you can specify the
following parameters:
- Display in cumulated or non-cumulated
form
Unit in which the
evaluations are to be carried out (for example, hours, minutes)
- Unit of measure for capacity
Indicator used to
specify that capacity requirements and available capacities are displayed on
the planning tables in the unit of measure that you maintained in the relevant
capacities.
Key with which you
specify whether the scheduled requirements or remaining requirements are to be
displayed.
In the
standard overview , only the periods which are within these load
limits are displayed.
You specify the time
interval to be evaluated here.
You specify the
first and last day to be displayed using a day counter which itself refers to
the current day.
In addition, you
must specify the
period type in which the time interval is to be defined during
the evaluation (for example "A" -> specification of the time interval in
the form of calendar days).
- Date for dispatching the backlog
Using the date for
dispatching the backlog, you specify to which date backlogs are to be
allocated. The capacity is taken into account as of this date. This date is
also defined in the form of a day counter.
Key with which you
specify the category of the period (for example, days, weeks or
months).
If you have selected
"MRP planning period" as the period type, then you must enter a planning
calendar.
Note
You should note that
the planning calendar is plant dependent.
The number of the
periods specifies how many units of the period type the period should
include.
If you entered
"week" for the period type and "4" for the number, for instance, the duration
of the period is 4 weeks.
Here, you define
whether the distribution specified in the
work center or
operation is to be taken into account, or whether an alternative
distribution is to be carried out.
You can specify an
alternative distribution specially for
networks or maintenance orders and for all other
orders.
Here, you
specify
- which hierarchy is to be used to
cumulate
- whether the available capacity is also to be
calculated using the hierarchy during the evaluation
- whether branches (for example, to the work
center) are to be carried out in the display mode or change mode
Here you specify
whether, on branching to the work center, the planned order and the production
order, you get to display or change mode.
Actions
Define the options profiles.