Entering Data for the First Reporting Point 
Use
In this process, you use two reporting points. At the first reporting point, you confirm the production quantity of 130 units. At this point, only parts R-1210, R-1230, and R-1242 are required. When you continue with production later, you determine that part R-1220 is defect. In assembly, you have already used 10 units of part R-1220. These 10 assemblies therefore have to be scrapped. R-1220 is replaced by component C-1230. At the second reporting point, you confirm 110 units and classify 10 units as work in process (130 units at reporting point 0010, minus 10 units scrap, minus 110 units at the second reporting point equals 10 units work in process).
For more information about this process, see
This process reflects the confirmation of 130 units that have made it to the first reporting point (milestone), as well as the change to the input quantity of component R-1210.
Procedure
Menu Path |
Logistics ® Production ® Repetitive Manufacturing ® Backflush ® REM Backflush |
Transaction Code |
MFBF |
Field |
Europe |
North America |
Backflush type |
||
Assembly backflush |
Select |
Select |
Yield backflush |
||
Backflush quantity |
130 |
130 |
Posting header |
||
Posting date |
Today’s date |
Today’s date |
Document date |
Today’s date |
Today’s date |
Make to stock production |
||
Material |
C-1113 |
C-1113 |
Plant |
1200 |
3200 |
Prod. version |
0001 |
0001 |
RP backflush |
Select |
Select |
Reporting point |
0010 |
0010 |
The components for material C-1113 are displayed.
Field |
Europe |
North America |
Material |
R-1210 |
R-1210 |
Quantity |
65 |
65 |
Plant |
1200 |
3200 |
Stor. loc. |
0001 |
0001 |
Field |
Data |
Machine time |
Select |
Activity to be confirmed |
5 |
Activity type |
1420 |