Show TOC

FunctionCreate New Item (Single Item)

 

This view allows you to create a single new item object. You must create items in a bucket on the lowest level of a hierarchy. A bucket and an item cannot co-exist in the same bucket.

Prerequisite
  • You have selected an existing bucket in the first Create New Item view (see Create New Item (Select Bucket)).

  • You have selected that you want to create a single item.

  • You have chosen the item type from the dropdown list.

Features

In the lower part of the screen, the following tab pages are available:

  • General Information

  • Additional Information

  • Financial Overview

  • Capacity Overview

  • Authorizations

  • Notes

Additionally, you can select a checkbox for escalating this item.

Fields on the General Information Tab Page

Field

Status

Explanation

Name

Mandatory

This is an alphanumeric field.

External ID

Mandatory

This is a unique identifier for the item and is an alphanumeric field.

Description

Optional

Enter a detailed description about the item.

Bucket Name

System generated

The system displays the name of the bucket within which the current item is being created.

cProjects Template

Optional

If you have configured templates for item types, you can choose these templates here.

If you choose a cProjects template, the project number, name, distribution unit, fixed start date and fixed finished date in cProjects will be overwritten by the item ID, name, unit, plan start date and plan finished date.

Proposal

Optional

Select this checkbox if the project associated with this item is at the proposal stage and should be displayed in the proposals list.

Subcategory

Optional

Select the subcategory from the drop down list.

Technology Type

Optional

Select the technology type from the drop down list.

Probability Technical Success

Display only

This field displays the probability of technical success based on the scoring model specified bucket level. The icon next to the field displays score details.

Probability Commercial Success

Display only

This field displays the probability based on the answers to the questionnaire associated with it. The questionnaire is specified in the parent bucket. During item creation, this icon is inactive.

Priority Group

Optional

Specify the priority by selecting from the drop down list.

Assessed Risk

Display only

This field displays the risk which is assessed based on the questionnaire associated with it. The questionnaire is specified in the parent bucket. During item creation, this icon is inactive.

User Name

Updated by the system

This user creating the item is displayed.

Plan Start Date

Optional

Date from which the project is/was planned to start. Enter the date manually or click the date picker next to the field to specify the date (see Date Picker).

Plan Finish Date

Optional

Date by which the project is/was planned to be completed. Enter the date manually or click the date picker next to the field to specify the date.

Forecasted Start Date

Optional

Date from which the project should start as per forecast. Enter the date manually or click the date picker next to the field to specify the date.

Forecasted Finish Date

Optional

Date by which the project is forecasted to be completed. Enter the date manually or click the date picker next to the field to specify the date.

Actual Start Date

Optional

Date on which the project actually started. Enter the date manually or click the date picker next to the field to specify the date.

Actual Finish Date

Optional

Date on which the project actually got completed. Enter the date manually or click the date picker next to the field to specify the date.

Fields on the Financial Overview Tab Page

Field

Status

Explanation

Currency

Mandatory

Specify the currency used in the project associated with this item by selecting from the drop down list.

Financial Period Breakdown

Mandatory

From the drop down list, select a time unit in which the financial information needs to be viewed and controlled.

Fields on the Capacity Overview Tab Page

Field

Status

Explanation

Capacity Period Breakdown

Mandatory

From the drop down list, select a time unit in which the capacity information needs to be viewed and controlled.

Unit

Mandatory

Specify the time unit for monitoring capacity by selecting from the drop down list.

Authorizations

On the Authorizations tab page, you can add and remove users and change their authorizations to access the item. The user creating the item is automatically added with administration rights.

Add a User
  1. Choose the Add User Manually pushbutton.

  2. Use the Search pushbutton to select the user and add him/her to the list.

Remove a User
  1. Click the box to the left of the user name.

  2. Choose the Remove pushbutton.

Change User Authorization
  1. Select the appropriate checkboxes under Admin, Owner, Read or Write.

  2. Click the icon to at the top right corner of the tray to display the description of each authorization.

  3. To view the inherited user list, click the Show/Hide users with inherited authorizations link.