Internal Orders (List): Plan/ActualTechnical name: 0OPA_C11_Q0001
If you want to modify this query, note the special features of the 0OPA_C11: CO-OM-OPA: Costs and Allocations .
This query is a regular report for the cost center manager. It provides an overview for the responsible cost center(s) assigned to an internal order. This overview is of the costs that are incurred on the internal order throughout the reporting time frame, as well as in the current fiscal year. It enables you to make an actual and plan cost analysis, taking cost elements and the corresponding variances into account.
Note
This query is contained in the workbook Internal Orders for the Responsible Cost Center: Plan/Actual .
For background information on the concept of queries, see Queries in Controlling .
InfoObject |
Description |
0CO_AREA |
Controlling area (variable 0P_COAR; single value entry, required) |
0CURTYPE |
Currency type (fixed value 10, company code currency) |
0FISCVARNT |
|
0COSTCENTER |
Responsible Cost Center (optional entry, variable 0S_RCCTR) |
InfoObject |
Description |
0STATUSSYS0 |
|
0COORD_TYPE |
InfoObject |
Description |
0COORDER |
InfoObject |
Description |
Planned costs for current year |
Planned costs in current fiscal year |
Actual costs for current year |
Actual costs in current fiscal year |
Variance (%) current year |
Percentage variance between actual and planned costs in the current fiscal year (actual - plan) / plan |
Planned costs total |
Planned costs throughout the reporting time frame |
Actual costs total |
Actual costs throughout the reporting time frame |
Variance (%) total |
Percentage variance between actual and planned costs throughout reporting time frame (actual - plan) / plan |