Cost Center (Range): Key Figures - Plan/Actual - SituationTechnical name: 0CCA_C03_Q0001
If you want to modify this query, note the special features of the 0OPA_C03 CO-OM-CCA: Statistical Key Figures InfoCube
This query provides the area manager with an overview of the statistical key figures entered into the cost center range per cost center during the reporting timeframe.
Note
This query is contained in the Cost Center (Range): Statistical Key Figures -Situation workbook
For background information on the concept of queries, see Queries in Controlling .
InfoObject |
Description |
0CO_AREA |
Controlling area (variable 0P_COAR; single value entry, required) |
0FISVARNT |
InfoObject |
Description |
0COSTCENTER |
Cost center (variable 0N_CCTR, 0H_CCTR) |
0STKEYFIG |
InfoObject |
Description |
Previous period and cumulated up to current period (Use of the Situation - Current Period structure) |
Values from the previous period and the cumulated values up to the current period |
Actual |
Actual quantities |
Plan |
Planned quantities |
Variance (%) |
Percentage variance between actual and plan quantities (actual - plan) / plan |
The
Plan quantities, actual quantities
and
Variance
key figures are displayed for the figures of the previous period and the cumulated up to the current period of the current fiscal year.