PSM: Internal Order (Detail): Plan/Actual Technical name: 0OPA_C11_Q0302
If you want to modify this query, note the special features of the InfoCube 0OPA_C11 CO-OM-OPA: Costs and Allocations .
This query is a regular report for the order manager. It provides an overview of the costs incurred on an internal order during the reporting time frame and the current fiscal year. It enables you to analyze the actual and plan costs at the level of cost elements and the corresponding variances.
For background information on the concept of queries, see Queries in Controlling .
InfoObject |
Description of InfoObject (or Restrictions or Calculation Formula) |
|---|---|
0CO_AREA |
Controlling area (variable 0P_COAR; single value entry, required) |
0CURTYPE |
Currency type (fixed value 10, company code currency) |
0FISCVARNT |
|
0COORDER |
Order (variable 0COOR) |
InfoObject |
Description of InfoObject (or Restrictions or Calculation Formula) |
|---|---|
0COSTELEMNT |
|
0FM_AREA |
|
0FUND |
|
0FUNC_AREA |
|
0GRANT_NBR |
InfoObject |
Description of InfoObject (or Restrictions or Calculation Formula) |
|---|---|
Planned costs for current year |
Planned costs in current fiscal year |
Actual costs for current year |
Actual costs in current fiscal year |
Variance (%) current year |
Percentage variance between actual and planned costs in the current fiscal year (actual - plan) / plan |
Planned costs total |
Planned costs in overall reporting time frame |
Actual cost total |
Actual costs in overall reporting time frame |
Variance (%) total |
Percentage variance between actual and planned costs in overall reporting time frame (actual - plan) / plan |