 Process (Range): Key Figures – Plan/Actual – Situation

Technical name: 0ABC_C02_Q0001

If you want to modify this query, note the special features of InfoCube CO-OM-ABC: Statistical Key Figures (0ABC_C02) .

Use

This query is a regular report for the process manager. It provides an overview of the planned quantities and actual quantities of the statistical key figures posted on the selected business processes. Reporting time frames are the previous period, the periods in the current year up to the current date (values are cumulated), and all periods of the current year (actual cost projection).

You must enter the controlling area when you call up the query. You can limit the displayed data further through the process. First select a process hierarchy. You can then further limit the data by specifying a range of processes or a single process.

Note Note

This query is contained in the workbook Process (Range): Analysis – Statistical Key Figures – Plan/Actual .

End of the note.

For background information on the concept of queries, see Queries in Controlling .

Filters

InfoObject

Description

0CO_AREA

Controlling area (variable &OP_COAR&, controlling area, single value entry, mandatory)

0FISCVARNT

Fiscal year variant (SAP exit variable &OP_FVAEX&: the system derives the fiscal year variant from the controlling area)

Rows

Row Name

Description (or Restrictions or Calculation Formula)

0ABCPROCESS

Business process number , variable &0N_ABC& (0H_ABC), business process area (business process hierarchy)

0STKEYFIG

Statistical key figure

Columns

Column Name

Description (or Restrictions or Calculation Formula)

Structure Situation – Current Period

Previous period / cumulated up to current period

Actual Quantity

Not displayed as a column; used to calculate the actual and planned quantities. See also CO-OM-ABC: Statistical Key Figures under Restricted Key Figures

Actual Quantity (Non-Cumulative Value)

Plan Quantity

Plan Quantity (Non-Cumulative Value)

Plan

Planned quantity + Planned quantity (non-cumulative value)

Actual

Actual quantity + Actual quantity (non-cumulative value)

Variance

Actual % plan

Plan/actual columns: The two restricted key figures Quantity and Quantity (Non-Cumulative Value) can be added together because only one of the two values can be filled for a given statistical key figure. The values are either a total (quantity) or a fixed value (non-cumulative).

Note Note

Statistical key figures can be either fixed values (non-cumulative) or sums (cumulative). This influences the aggregation behavior of the key figures. See also CO-OM-ABC: Statistical Key Figures under Use .

End of the note.

Report/Report Interface