Cost Center/Activity Type: Analysis - Target/Actual/VarianceTechnical name: 0CCA_C02_Q0004
If you want to modify this query, note the special features of the 0CCA_C02 CO-OM-CCA: Costs and Allocations (per Activity Type) InfoCube
This query is an analysis report for the cost center manager. This query provides an overview of the incurred costs and consumption quantities on a cost center/activity type during the reporting timeframe.
Note
This query is contained in the Cost Center (Range): Analysis - Activity Type workbook
For background information on the concept of queries, see Queries in Controlling .
InfoObject |
Description |
0CO_AREA |
Controlling area (variable 0P_COAR; single value entry, required) |
0CURTYPE |
Currency type (fixed value 20, controlling area currency) |
0FISCVARNT |
|
0METYPE |
Key figure category (fixed value 1010, split costs) |
InfoObject |
Description |
0FISCPER |
Fiscal year/period (variable 0I_FPER) |
0COSTELMNT |
InfoObject |
Description |
0COSTCENTER |
Cost center (variable 0S_CCTR) |
0ACTTYPE |
InfoObject |
Description |
Target - split |
Split target costs distributed to the activity type during the reporting time frame (controlling area currency) |
Actual - split |
Split target costs distributed to the activity type during the reporting time frame (controlling area currency) |
Variance (%) |
Percentage variance between split actual and target costs |
Activity quantity -plan |
Plan quantities in the reporting timeframe |
Activity quantity - actual |
Actual quantities in the reporting timeframe |
Variance (%) |
Percentage variance between plan and actual quantities in the reporting timeframe |