 Cost Center (Detail): Analysis - Activity Quantity - Plan/Actual

Technical name: 0CCA_C04_Q0001

If you want to modify this query, note the special features of the 0CCA_C04 CO-OM-CCA: Activity Type Quantities and Prices InfoCube

Use

This query provides the cost accountant and the cost center manager with an overview of the costs and activity quantities provided by a cost center in planning and actual data during the reporting time frame.

Note Note

This query is contained in the Cost Center (Detail): Analysis, Activity Quantity - Plan/Actual workbook

End of the note.

For background information on the concept of queries, see Queries in Controlling .

Filters

InfoObject

Description

0CO_AREA

Controlling area (variable 0P_COAR; single value entry, required)

0COSTCENTER

Cost center (variable 0P_CCTR)

0FISCVARNT

Fiscal year variant (SAP exit variable 0P_FVAEX)

User-Defined Characteristics

InfoObject

Description

0FISCPER

Fiscal year/period (variable 0I_FPER)

Rows

InfoObject

Description

0ACTTYPE

Activity type

Columns

InfoObject

Description

Activity quantity: Plan

Plan activity quantity in the reporting timeframe

Activity quantity: Actual

Actual activity quantity in the reporting timeframe

Activity quantity: Variance

Difference between actual and plan activity quantity

Activity quantity: Variance (%)

Percentage variance between actual and plan activity quantity with reference to the plan

Capacity: Plan

Plan capacity in the reporting timeframe

Capacity: Actual

Actual capacity in the reporting timeframe

Capacity: Variance

Difference between actual and plan capacity

Capacity: Variance (%)

Percentage variance between actual and plan capacity with reference to the plan

Scheduled activity: Plan

Scheduled activity quantity (plan) in reporting timeframe

Scheduled activity: Actual

Scheduled activity quantity (actual) in reporting timeframe

Scheduled activity: Variance

Difference between scheduled activity (actual) and scheduled activity (plan)

Scheduled activity: Variance %

Percentage variance between scheduled actual and plan activity with reference to the plan

Output: Plan

Plan output quantity in the reporting timeframe

Output: Actual

Actual output quantity in the reporting timeframe

Output: Variance

Difference between actual and plan output quantity

Output: Variance %

Percentage variance between actual and plan output with reference to the plan