Procedure documentationCreating Handling, Vehicle, Calendar, and Transp. Unit Resources

 

This procedure describes how to create the following resource types:

Prerequisites

  • You have specified a factory calendar in Customizing for SAP Transportation Management (SAP TM) under Start of the navigation path SCM Basis Next navigation step Master Data Next navigation step Calendar Next navigation step Maintain Factory Calendar End of the navigation path.

  • If you want to create a vehicle resource, you have to have specified a means of transport in Customizing for SAP TM under Start of the navigation path Transportation Management Next navigation step Master Data Next navigation step Resources Next navigation step Define Means of Transport End of the navigation path.

Procedure

  1. You have the following options:

    • On the SAP Easy Access screen, choose Start of the navigation path Transportation Management Next navigation step Master Data Next navigation step Resources Next navigation step Define Resource End of the navigation path.

    • In SAP NetWeaver Business Client, choose Start of the navigation path Master Data Next navigation step Resources Next navigation step Define Resource End of the navigation path.

  2. Choose the Create Resources pushbutton.

  3. Select the tab page for the resource type for which you want to create a new resource.

    Note Note

    You cannot change the resource type later.

    End of the note.
  4. For handling resources, specify the resource class, the time zone or location, and the factory calendar.

    For calendar resources, specify the time zone or location, and the factory calendar.

    For vehicle resources, specify the resource class, the time zone or depot location, the factory calendar, the means of transport, the dimension, and the capacity.

    For transportation unit resources, specify the resource class, the time zone or depot location, the factory calendar, the dimension, and the capacity.

    Note Note

    You can specify the depot location in the Location column.

    End of the note.

    For more information about resource classes, see Classification of Resources.

  5. In addition, you can define other resource-specific information, such as downtimes, attached equipment, time-continuous capacity, or qualifications.