Prerequisites: Activation of the DataSource.
This DataSource is used to extract data from the ODS object 0KB_DS01. When a user requests for data extraction, the data is extracted using a data communicator. The extracted data is then sent to the ODS object which is then transferred to the datasource. The updated data is sent to the infosource, 2LIS_04_PKKANBAN.
Application Component | Production Planning (PP) |
|---|---|
Available as of Release | SAP ECC 6.0 |
Shipment | SAP NetWeaver 7.0 BI Content Addon-On 3 SP06 |
Content Versions | 1 |
RemoteCube-Capable | No |
Delta-Capable | Yes |
Extraction from Archives | No |
Verifiable | Yes |
AIM
Fields in the Extract Structure | Description of the Field in the Extract Structure | Table of Origin | Field in the Table of Origin |
|---|---|---|---|
ROCANCEL |
Indicator: Cancel Data Record |
– |
— |
.INCLUDE |
Extraction PP-BW: Kanban view from MCKANB |
||
ACPTD |
Actual Consumption Time in Days |
PKPS |
PKBST, SADT2, SAUZ2 |
ACPTH |
Actual Consumption Time in Hours |
PKPS |
PKBST, SADT2, SAUZ2 |
ACQTY |
Total Actual Container Quantity |
||
ACRTD |
Actual Kanban Correction Time in Days |
PKPS |
PKBST, SAEDT, SAEUZ |
ACRTH |
Actual Kanban Correction Time in Hours |
PKPS |
PKBST, SAEDT, SAEUZ |
AIPTD |
Actual In Process/In Transit Time in Days |
PKPS |
PKBST, SAEDT, SAEUZ |
AIPTH |
Actual In Process/In Transit Time in Hours |
PKPS |
PKBST, SAEDT, SAEUZ |
ARFTD |
Actual Refill Time in Days |
PKPS |
PKBST, SADT2, SAUZ2 |
ARFTH |
Actual Refill Time in Hours |
PKPS |
PKBST, SADT2, SAUZ2 |
ARLTD |
Actual Replenishment Lead Time in Days |
PKPS |
PKBST, SADT2, SAUZ2 |
ARLTH |
Actual Replenishment Lead Time in Hours |
PKPS |
PKBST, SADT2, SAUZ2 |
AWTTD |
Actual Wait Time in Days |
PKPS |
PKBST, SAEDT, SAEUZ |
AWTTH |
Actual Wait Time in Hours |
PKPS |
PKBST, SAEDT, SAEUZ |
BAMME |
Base Unit of Measure |
PKHD |
MEINS |
BEHAZ |
Number of Kanban Containers |
PKHD |
MEINS |
EMTYBX |
Number of Kanbans with Status "Empty" |
PKPS |
PKBST |
ERLTD |
Expected Replenishment Lead Time in Days |
PKHD |
KWBZD |
ERLTH |
Expected Replenishment Lead Time in Hours |
PKHD |
KWBZM |
ERRNM |
Number of Kanbans with Status "Error" |
PKPS |
PKBST |
FULLBX |
Number of Kanbans with Status "Full" |
PKPS |
PKBST |
LGORT |
Storage Location |
PVBE |
LGORT |
LIFNR |
Vendor Account Number |
PKHD |
LIFNR |
MATNR |
Material Number |
PKHD |
MATNR |
PROCMD |
Replenishment Type |
PKHD |
PKSTE, PKSTF and PKSTU |
PRVBE |
Supply Area |
PKHD |
PRVBE |
REPSTE |
Control Cycle Replenishment Strategy for External Replenish. |
PKHD |
PKSTF |
REPSTI |
Control Cycle Replenishment Strategy for In-House Production |
PKHD |
PKSTE |
REPSTS |
Control Cycle Replenishment Strategy for Stock Transfer |
PKHD |
PKSTU |
RGVRQ |
Person responsible for one or more supply areas |
PKHD |
RGVER |
RGVRV |
Person responsible for one or more supply areas |
PVBE |
RGVER |
SAEDT |
Last Changed On |
PKPS |
SAEDT |
SAEUZ |
Time of Last Status Change |
PKPS |
SAEUZ |
SIGAZ |
Maximum Number of Empty Containers |
PKHD |
SIGAZ |
SSLOC |
Storage Location |
PKHD |
UMLGO |
TOTSTCK |
Total Stock |
PKPS |
PKIMG |
TRQTY |
Total Target Container Quantity |
||
TRXHR |
Transaction Hour (Format HH) |
PKPS |
SAEUZ |
WERKS |
Plant |
PKHD |
WERKS |
Key figures would be validated against LIS table S029 in SAP ECC 6.0