Show TOC

Kanban - Interoperation Times and Stock Analysis Locate this document in the navigation structure

DataSource Transactional Data DataSource Transactional Data: 2LIS_04_PKKANBAN

 

Prerequisites: Activation of the DataSource.

This DataSource is used to extract data from the ODS object 0KB_DS01. When a user requests for data extraction, the data is extracted using a data communicator. The extracted data is then sent to the ODS object which is then transferred to the datasource. The updated data is sent to the infosource, 2LIS_04_PKKANBAN.

Technical Data

Application Component

Production Planning (PP)

Available as of Release

SAP ECC 6.0

Shipment

SAP NetWeaver 7.0 BI Content Addon-On 3 SP06

Content Versions

1

RemoteCube-Capable

No

Delta-Capable

Yes

Extraction from Archives

No

Verifiable

Yes

Data Modeling

Delta Update

AIM

Fields of Origin for the Extract Structure

Fields in the Extract Structure

Description of the Field in the Extract Structure

Table of Origin

Field in the Table of Origin

ROCANCEL

Indicator: Cancel Data Record

.INCLUDE

Extraction PP-BW: Kanban view from MCKANB

ACPTD

Actual Consumption Time in Days

PKPS

PKBST, SADT2, SAUZ2

ACPTH

Actual Consumption Time in Hours

PKPS

PKBST, SADT2, SAUZ2

ACQTY

Total Actual Container Quantity

ACRTD

Actual Kanban Correction Time in Days

PKPS

PKBST, SAEDT, SAEUZ

ACRTH

Actual Kanban Correction Time in Hours

PKPS

PKBST, SAEDT, SAEUZ

AIPTD

Actual In Process/In Transit Time in Days

PKPS

PKBST, SAEDT, SAEUZ

AIPTH

Actual In Process/In Transit Time in Hours

PKPS

PKBST, SAEDT, SAEUZ

ARFTD

Actual Refill Time in Days

PKPS

PKBST, SADT2, SAUZ2

ARFTH

Actual Refill Time in Hours

PKPS

PKBST, SADT2, SAUZ2

ARLTD

Actual Replenishment Lead Time in Days

PKPS

PKBST, SADT2, SAUZ2

ARLTH

Actual Replenishment Lead Time in Hours

PKPS

PKBST, SADT2, SAUZ2

AWTTD

Actual Wait Time in Days

PKPS

PKBST, SAEDT, SAEUZ

AWTTH

Actual Wait Time in Hours

PKPS

PKBST, SAEDT, SAEUZ

BAMME

Base Unit of Measure

PKHD

MEINS

BEHAZ

Number of Kanban Containers

PKHD

MEINS

EMTYBX

Number of Kanbans with Status "Empty"

PKPS

PKBST

ERLTD

Expected Replenishment Lead Time in Days

PKHD

KWBZD

ERLTH

Expected Replenishment Lead Time in Hours

PKHD

KWBZM

ERRNM

Number of Kanbans with Status "Error"

PKPS

PKBST

FULLBX

Number of Kanbans with Status "Full"

PKPS

PKBST

LGORT

Storage Location

PVBE

LGORT

LIFNR

Vendor Account Number

PKHD

LIFNR

MATNR

Material Number

PKHD

MATNR

PROCMD

Replenishment Type

PKHD

PKSTE, PKSTF and PKSTU

PRVBE

Supply Area

PKHD

PRVBE

REPSTE

Control Cycle Replenishment Strategy for External Replenish.

PKHD

PKSTF

REPSTI

Control Cycle Replenishment Strategy for In-House Production

PKHD

PKSTE

REPSTS

Control Cycle Replenishment Strategy for Stock Transfer

PKHD

PKSTU

RGVRQ

Person responsible for one or more supply areas

PKHD

RGVER

RGVRV

Person responsible for one or more supply areas

PVBE

RGVER

SAEDT

Last Changed On

PKPS

SAEDT

SAEUZ

Time of Last Status Change

PKPS

SAEUZ

SIGAZ

Maximum Number of Empty Containers

PKHD

SIGAZ

SSLOC

Storage Location

PKHD

UMLGO

TOTSTCK

Total Stock

PKPS

PKIMG

TRQTY

Total Target Container Quantity

TRXHR

Transaction Hour (Format HH)

PKPS

SAEUZ

WERKS

Plant

PKHD

WERKS

Verification of Key Figures

Key figures would be validated against LIS table S029 in SAP ECC 6.0

Unsychronized Backup Recovery in BI System