Technical name: 0APO_ORWAIT
Use
Interval between the end of shipment, and the start of execution. This wait time is a time buffer that can be used if required in case of disruptions in the production run. It can be maintained in the workplace or in the operation.
Technical data
|
Available as of release |
SAP APO 3.0A |
|
Unit |
APO time dimension unit (0APO_TUNIT) |
|
Aggregation |
Summation |
|
Exception aggregation |
Summation |