Show TOC

Performance Analysis - Overall Equipment Effectiveness (OEE) Locate this document in the navigation structure

Query Query: 0PP_MP16_Q001

 

You use this query to monitor performance data for work centers of a particular plant based on the selection criteria like plant, work center, and date range.

Analysis on the basis of the following factors is carried out in the dashboard:

  • Performance per plant

  • Performance per work center

  • Performance per month for plant

  • Performance per month for work center

  • Performance per day of month

  • Performance per material for work center

  • Performance per month for material

The results are aggregated at plant level and displayed in tabular form. You can view the results based on the work center and the month.

The performance of a work center is based on the calculation Performance = Actual Rate of Production / Planned or Standard Rate of Production. The performance of a work center represents the speed at which the work center runs compared with the design speed. This query is based on the InfoCube 0PP_MP16 and was developed for the business package for Production Supervisor.

Structure

Free Characteristics

Object Type

Name

Technical Name

Work Center

0WORKCENTER

Material

0MATERIAL

Calendar Year/Month

0CALMONTH

Calendar Day

0CALDAY

Rows

Object Type

Name

Technical Name

Value Restriction / Calculation

Plant

0Plante

Columns

Object Type

Name

Technical Name

Value Restriction / Calculation

Actual Production Rate

0PP_MP16_CD0023

Standard Production Rate

0PP_MP16_Q0024

Performance %

0PP_MP16_CK0014