Start of Content Area

Planned/Act. Lead Time Deviation in Percent  Locate the document in its SAP Library structure

Technical Name: 0C_PA_LEADTIME_%

Use

Planned/actual comparison order/material view: This InfoObject calculates the percentage deviation of the actual lead time from the planned lead time technical data.

 

Technical Data

Available from Release

R/3 Release 3.0F

Calculation

'Act-Lead time’ % ‘P.Lead time'

 

 

 

 

End of Content Area