Key figure APO Goods Issue Processing Time  Locate the document in its SAP Library structure

Technical name: 0APO_GIPRT

Use

Refers to the time taken between withdrawing the material from the warehouse stock and transporting it. This time is used for load transfer or quality control and is considered (and calculated as) part of the transportation duration (Supply Network Planning and PP/DS) of a product.

Example

Goods issue processing time: 1 day

Transportation duration: 3 days

1 day + 3 days = 4 days

Result: the product is available on day 5

Technical data

Available as of release

SAP APO 3.0A

Aggregation

Maximum

Exception aggregation

No aggregation

 

 