APO Goods Issue Processing Time
Technical name: 0APO_GIPRT
Use
Refers to the time taken between withdrawing the material from the warehouse stock and transporting it. This time is used for load transfer or quality control and is considered (and calculated as) part of the transportation duration (Supply Network Planning and PP/DS) of a product.

Goods issue processing time: 1 day
Transportation duration: 3 days
1 day + 3 days = 4 days
Result: the product is available on day 5