Technical name: 0C_A_CHANGEOVER, 0C_T_CHANGEOVER
(This key figure has two technical names, because it is calculated based on two different InfoCubes).
Use
Used by the Exact Lead Times/Execution Times Work Center (0PP_C03_Q012). This
SCOR key figurecompares the planned changeover times with the actual changeover times.Prerequisites for use:
Technical Data
|
Available from release |
R/3 Release 3.0A |
|
Calculation of Actual Set-Up Time |
Actual Set-Up Time + Actual Tear Down Time |
|
Calculation of Target Set-Up Time |
Target Set-Up Time + Target Tear Down Time |