Target Capacity Load Utilization
Technical name: 0C_T_CAPAUTIL_%
Use
Period-Specific Operation/Work Center View:
This InfoObject calculates the percentage proportion of the target capacity requirements from the available capacity.Distribution of the capacity requirements across several periods, as is the norm in capacity planning, does not take place. Evaluation only makes sense, therefore, over a large selection period or for operations that are processed within a day.

From R/3 Release 4.0B, the key figure 0C_T_CAPAUTIL_%_PP is to be used for capacity evaluations.
Technical Data
|
Available from Release |
R/3 Release 3.0F |
|
Calculation |
"target capacity requirements" %A "available capacity" |