Overall Equipment Effectiveness (OEE) Locate this document in the navigation structure

Query Query: 0PP_MP16_Q004

 

You use this query to analyze the Overall Equipment Effectiveness (OEE) of a work center at plant, work center or period level.

Analysis on the basis of the following factors is carried out in the dashboard:

  • OEE per plant

  • OEE per work center

  • OEE per month for plant

  • OEE per month for work center

  • OEE per day of month

  • OEE per material for work center

  • OEE per month for material

The OEE is calculated based on the formula OEE = Availability% * Performance% * Yield% /10000. This query is based on the InfoCube 0PP_MP16 and was developed for the business package for Production Supervisor.

Structure

Free Characteristics

Object Type

Name

Technical Name

Work Center

0WORKCENTER

Material

0MATERIAL

Calendary Year/Month

0CALMONTH

Calendary Day

0CALDAY

Rows

Object Type

Name

Technical Name

Value Restriction / Calculation

Plant

0PLANT

Columns

Object Type

Name

Technical Name

Value Restriction / Calculation

Availability %

0PP_MP16_CK0007

Performance %

0PP_MP16_CK0014

Yield %

0PP_MP16_CK0003

Overall Equipment Effectiveness %

0PP_MP16_CK0017

ActualProcessingTime

0ACTPROCTME

Actual Setup Time

0ACTSETUPTM

ActualTeardown Time

0ACTTEARDWN

Operating Time

0USINGTIME

Actual Quantity

0CONFRM_QTY

TgtExecutionTime

Ex. 0TGTEXECTMX

Target Quantity

0OPER_QTY

Act. Exec. Time Exact

0ACTEXECTMX

Actual Scrap

0CONF_SCRAP

Rework

0REWORKQTY