Technical Name: 0C_A_LEADTMX_PPC03
Use
Planned/Actual Comparison: Operation/Work Center View:
This InfoObject calculates the average, actual lead time per operation in the work center.The actual lead time is calculated in a changeable unit and is made up of the difference in time between the target start date (which is made up from the backflush date of the preceding operation) and the backflush date. The minimum wait time of the preceding operation is deducted.
Technical Data
|
Available from Release |
R/3 Release 4.0B |
|
Calculation |
'Act-Lead time ex.' / 'Num. ProdOrd.' |