Show TOC

Expected Replenishment Lead Time in Days Locate this document in the navigation structure

Key Figure Key Figure: 0KB_ERLTD

 

This key figure defines the expected days to replenish a kanban container in a particular control cycle, that is, the total number of expected days a kanban container takes to change from status EMPTY to FULL.

The value for the expected replenishment lead time in days is obtained from the following:

  1. Control cycle master data

  2. Calculation profile for a control cycle (if maintained in control cycle)

  3. If expected replenishment lead time is not maintained in both control cycle and calculation profile, then, the value is empty in the corresponding query.

The expected replenishment lead time is calculated in hours, if the replenishment lead time is less than a day. For more details, see Expected Replenishment Lead Time in Hours.

Technical Data

Available as of Release

SAP ECC 6.0

Aggregation

Average

Exception Aggregation

Average

Calculation

No

Restriction

No

Data Modeling

Has aggregation-referenced characteristic

Object Type

Name

Technical Name

InfoObject

Period to Analyze - Hourly

0KB_AHOUR