Technical Name: 0C_T_LEADTMX_PP03
Use
Planned/Actual Comparison: Operation/Work Center View:
This InfoObject calculates the average, target lead time per operation in the work center.The target lead time is calculated in a changeable unit and is made up of the difference in time between the target start date (which is made up from the target backflush date of the preceding operation) and the target backflush date. The minimum wait time of the preceding operation is deducted.
Technical Data
|
Available from Release |
R/3 Release 4.0B |
|
Calculation |
'Tgt-Lead time ex.' / 'Num.ProdOrd.' |