Show TOC

Component View from PP/PP-PI (as of R/3 Release 4.0B) Locate this document in the navigation structure

InfoSource InfoSource: 2LIS_04_P_COMP

 

This InfoSource supplies the consumptions of materials during the production process and represents information on the material components.

As of R/3 Release 4.0B, InfoSource 2LIS_04_P_COMP replaces InfoSource 2LIS_04_S282.

The following InfoCubes are loaded with this InfoSource:

1) 0PP_C05

2) 0PP_C06

You can find more information under Special Features When Using PP-PI.

Data Modeling

Requires

Object Type

Name

Technical Name

Application

Production Planning and Control

PP