Technical name: SAP_BW_0ROLE_0061
Task Area
The MRP controller is responsible for material requirements planning and material availability.
They ensure that the materials required to manufacture finished products or superior assemblies are available on time. They evaluate the material requirements planning that generates receipts (order proposals) for customer requirements and the planned independent requirements of the finished products. As a result of these receipts, secondary requirements are created for the subordinate assembly or materials that must in turn be covered by receipts.
Depending on the company structure, the MRP controller can be responsible for the material availability for the entire production chain of a product as well as for the material availability of certain production levels.
They can use key figures such as range of coverage and exception messages to help them complete their tasks.
The MRP controller's tasks include:
Structure
Tasks in the Business Information Warehouse
The MRP controller monitors stocks, carries out order and material analyses, operation and work center analyses, as well as quality analyses. To accomplish these tasks, BW provides Business Content information in the form of workbooks. Each task corresponds to a cluster of one or more workbooks. The workbooks contain one or more queries that yield the relevant information. The tasks (clusters) are logically grouped together into task areas (subchannels). The following workbooks are available for the MRP controller:
Area to Analyze (Cluster) |
Workbook |
Stocks |
Quantity-based warehouse stock |
|
Value-based warehouse stock | |
|
Period-dependent requirements coverage | |
|
Obsolete warehouse stock | |
|
Range of coverage - quantity | |
|
Range of coverage raw materials - quantity | |
|
Range of coverage finished products - quantity | |
|
Range of coverage raw materials - value | |
|
Range of coverage - value | |
|
Range of coverage - value | |
|
Material stock and movements |
Area to Analyze (Cluster) |
Workbook |
Sales information |
Sales orders, material |
Area to Analyze (Cluster) |
Workbook |
Changes to stock |
Material movements |
|
Inventory turnover | |
|
Consignment stock, receipts and issues | |
|
Evaluated stock, receipts and issues | |
|
Material consumption | |
|
Material consumption, repetitive manufacturing | |
|
Target/actual material consumption | |
|
Order quantities |
Production Analyses
Area to Analyze (Cluster) |
Workbook |
Capacity analyses |
Capacity load utilization, basis confirmation date |
|
Capacity load utilization, basis confirmation date | |
Duration and schedule deviation |
Negative and positive schedule deviation, order view |
|
Schedule and lead time deviation, order view | |
|
Lead time production | |
|
Scheduling deviations, overall and detailed | |
|
Exact lead/execution times, order view | |
Quantities |
Order quantities |
|
Plan realization | |
|
Target/actual material consumption | |
Combination quantities/times |
Schedule and scrap deviation, order view |
|
Quantity, scrap and lead time deviation, order view | |
Period-specific actual data |
Goods receipt quantity and scrap |
|
Material consumption |
Quality Analyses
Area to Analyze (Cluster) |
Workbook |
Notifications |
Notification analysis - quality management |
|
Error analysis - notifications | |
Inspection lots |
Material analysis - inspection lots |